![ThorWorks Industries SealMaster 300 Series Owner'S Manual Download Page 9](http://html1.mh-extra.com/html/thorworks-industries/sealmaster-300-series/sealmaster-300-series_owners-manual_1111268009.webp)
7
HEATED ASPHALT DISTRIBUTOR
APPLIES TO ALL TRAILER AND SKID VERSIONS
OPERATING INSTRUCTIONS
HEATING THE MATERIAL - 1 cont.
Once you have ignition, you must continue to depress the red push button on gas
pilot valve
#8
for at least 10 seconds. This allows the thermocouple
#9
to heat up,
allowing the gas valve to continue the gas flow. If the flame stays on, then open
gas shut-off valve
#7
all the way to get maximum heat from the burner.
If the flame goes out, you will need to start over with the lighting
process. Anytime you want to decrease the flame intensity, slightly close gas shut-
off valve
#7
.
4.
The thermocouple
#9
also acts as a safety. Should the flame go out because
of wind, the thermocouple immediately starts to cool off and stops the signal
to the gas valve, which then stops the flow of gas. This may take up to 30
seconds.
WAIT 10 MINUTES BEFORE TRYING TO RE-LIGHT THE
BURNER.
5.
Monitor material temperature on thermometer
#13
. As the material reaches
the desired temperature you can slightly close gas shut-off valve
#7
to
decrease the flame, or just shut off the valve completely.
NEVER DRIVE WITH THE BURNER LIT!!
Summary of Contents for SealMaster 300 Series
Page 1: ......
Page 7: ...5 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 34: ...32 PUMP DIAGRAM 16 j j I ...