background image

IS---0271

IS---168DRG

March 2010

Page 1 of2

Operating Instructions

168DRG

Insulated Cap with Test Point & Ground Lead

CONTENTS: Insulated Cap with test point, Ground Lead, Lubricant, Operating Instructions

The 168DRG is designed for insulating, shielding and watersealing any ELASTIMOLD 15kV class (8.3kV phase---to---ground

and 14.4kV phase---to---phase) loadbreak bushing interface.

DANGER

All apparatus must be de--energized during installation

or removal of part(s) except for test point caps and

indicators that can be installed and operated

energized.
After installation loadbreak products can be operated

energized per operating instructions. All deadbreak

connectors must be de--energized before operating.
All apparatus must be installed and operated in

accordance with individual user, local, and national

work rules. These instructions do not attempt to

provide for every possible contingency.
Do not touch or move energized products.

“Loadbreak connectors must be operated with a full

insulated “hotstick” type live--line tool.” Consult the

company’s safe work practices for the required

live--line tool length.

Excess distortion of the assembled product may result

in its failure.
Inspect parts for damage, rating and compatibility with

mating parts.
This product should be installed only by competent

personnel trained in good safety practices involving

high voltage electrical equipment. These instructions

are not intended as a substitute for adequate training or

experience in such safety practices.
Failure to follow these instructions will result in

damage to the product and serious or fatal injury.
If this product is supplied with a protective shipping

cover(s), remove this shipping cover(s) and replace

with the appropriate HV insulated cap(s) or

connector(s) before submerging or energizing the

circuit.

FOR MORE INFORMATION ON PARTS, INSTALLATION RATINGS AND COMPATIBILITY, CALL THE NEAREST ELASTIMOLD OFFICE.

IMPORTANT

1. Check contents of package to ensure they are complete

and undamaged.

2. Check all components to ensure proper fit with cable

and/or mating products.

3. Read entire installation instructions before starting.

4. Have all required tools at hand and maintain cleanliness

throughout the procedure.

STEP 1

Connect free end of electrostatic grounding wire to the system ground, leaving enough slack for hot---stick operation of the

insulated cap.

CAUTION:

The electrostatic grounding wire should be trained so as not to contact the bushing interface

during operation.

WARNING:

IF THE GROUND LEAD DISCONNECTS DURING OPERATION, DO NOT ATTEMPT TO

REATTACH WITHOUT FIRST PULLING INSULATED CAP OFF THE BUSHING WITH THE HOTSTICK.

Protective Cover

Grounding Eye

To Ground

IS---0271

IS---168DRG

March 2010

Printed in U.S.A.

8155 T&B Boulevard, Memphis, Tennessee 38125

(800) 888--0211 Fax: (800) 888--0690

Reviews: