7. Venting and Combustion Air

WARNING: The vent must be installed in
accordance with national and local regulations.
Failure to provide proper venting could result in
death, serious injury and/or property damage. This
unit must be installed with a vent to the outside of
the building. Safe operation of any power-vented
gas-fired equipment requires a properly operating
vent system, correct provision for combustion air,
and regular maintenance and inspection.

WARNING: Units installed in multiples require
individual vent pipe runs and vent caps.
Manifolding of vent runs is not permitted due to
possible recirculation of combustion products into
the building and back pressure effects on the
combustion air proving switch.

Venting must be in accordance with the National Fuel Gas Code Z223.1
or CAN/CGA B149.1 and B149.2, Installation Code for Gas Burning
Appliances and Equipment, and all local codes. Local requirements
supersede national requirements. Combustion air for this heater may be
either taken from the space or may be ducted from the outside using the

STEP 1 - Decide which Venting System to Install:

concentric adapter combustion air/vent system. Flue products must
always be vented to the outdoors.
Installation should be done by a qualified agency in accordance with
these instructions. The qualified service agency installing the vent or
vent/combustion air system is responsible for the installation.

The venting or venting/combustion air systems illustrated in this manual
are the only ones approved for a Model CAUA heater. However, since
more than one system is approved and requirements vary depending on
the type of installation, the first step must be deciding which vent or
vent/combustion air system is going to be installed. Review the follow-
ing matrix of vent types and installation requirements. If there is any
doubt as to what type of vent is required, contact the equipment dis-
tributor before beginning installation.

Hazards of Chlorines - The presence of chlorine vapors in the com-
bustion air of gas-fired heating equipment presents a potential corro-
sion hazard. Chlorine will, when exposed to flame, precipitate from the
compound, usually freon or degreaser vapors, and go into solution with
any condensation that is present in the heat exchanger or associated
parts. The result is hydrochloric acid which readily attacks all metals
including 300 grade stainless steel.

Care should be taken to separate these vapors from the combustion
process. This may be done by installing a separated combustion sys-
tem and/or wise location of the furnace with regard to exhausters or
prevailing wind direction. Chlorine is heavier than air. This fact should
be kept in mind when determining installation locations of heating equip-
ment and building exhaust systems.

Type of 
Installation

Type of Vent System 

(Description/Instructions) 

Vent Configuration/Options 
Required

Type of VENT Pipe* Required

Horizontal Vent / Option CC6 
(includes  concentric adapter box, 
exhaust terminal, and inlet air guard)

Vertical Vent / Option CC2 
(includes concentric adapter box, 
exhaust terminal, and combustion air 
inlet)

Horizontal Vent  / Option CC1 
Vent Cap or field-supplied 
equivalent (see page 11)

Use either vent pipe approved for a Category III 
appliance OR appropriately sealed 26-gauge 
galvanized steel or equivalent single-wall pipe. If 
local code requires, the terminal section may be 
double-wall pipe with a single-wall vent run.

Vent pipe listed above for a horizontal power-
vented system may be used, OR vent pipe 
approved for a Category I heater may be used. 
Single-wall pipe or double-wall (Type B) vent 
pipe are suitable for use with a Category I heater. 

If local code requires, the terminal section may be 
double-wall pipe with a single-wall vent run.

Use either vent pipe approved for a Category III 
appliance OR single-wall, 26-gauge or heavier 
galvanized (or a material of equivalent durability 
and corrosion resistance) vent pipe. 

Power-Vented (uses a power 
venter to draw combustion air 
from the indoor space and 
exhaust flue products to the 
outdoors) - (follow 
Instructions in S ection 7B)

COMMERCIAL/ 
INDUS TRIAL 
(Harmonized 
ANS I Z83.8-1996 
and Canadian 
S tandard 
CAN/CGA 2.6-
M96)

S eparated-Combustion  
(uses a power venter to duct 
combustion air from outdoors 
and exhaust flue products to 
the outdoors) - (follow 
Instructions in S ection 7A)

At least 1/2 of the Equivalent 
Vent Length is Vertical  / Option 
CC1
 Vent Cap or field-supplied 
equivalent (see page 11)

STEP 2 - 

Follow the instructions that apply to the type of vent being

installed

Separated-Combustion -- requires air inlet pipe, exhaust vent pipe,  and concentric adapter kit  (Option CC2 or CC6)

Using required pipe (See Table above), FOLLOW INSTRUCTIONS IN SECTION 7A

Power Vent  -- requires vent pipe and vent cap (Option CC1 or field-supplied Type L Breidert Air-x-hauster

®

 or equivalent vent

cap)

Using required pipe (See Table above), FOLLOW INSTRUCTIONS IN SECTION 7B

Summary of Contents for CAUA 150

Page 1: ...rtment WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Refer to this manual For assistance or additional information consult a qualified installer service agency or the gas supplier WARNING Gas fired appliances are not designed for use in hazardous atmospheres containingflammablevaporsorcombustibledust See Hazard Levels page 2 GE...

Page 2: ...eNetWeight lbs Size 150 200 250 300 350 400 Weight lbs 288 300 380 394 445 460 WARNING Unit must be level for proper operation Do not place or add additional weight to the heater See Hazard Levels page 2 Determine the position of the heater with regard to venting combus tion air gas supply connection electrical supply connection and inlet air opening Either cut out the inlet air opening requires t...

Page 3: ... P 150 965 883 914 533 184 95 318 610 838 787 483 864 117 200 965 883 914 533 184 95 318 610 838 787 483 864 117 250 1270 883 1219 533 184 111 324 692 1143 787 406 1168 121 300 1270 883 1219 533 184 111 324 692 1143 787 406 1168 121 350 1270 1238 1219 864 178 111 359 679 1143 1118 813 1168 124 400 1270 1238 1219 864 178 111 359 679 1143 1118 813 1168 124 Air Opening Dimensions Supply Air Discharge...

Page 4: ... all metals including 300 grade stainless steel Care should be taken to separate these vapors from the combustion process This may be done by installing a separated combustion sys tem and or wise location of the furnace with regard to exhausters or prevailing wind direction Chlorine is heavier than air This fact should be kept in mind when determining installation locations of heating equip ment a...

Page 5: ... the specific requirements and instructions in the following paragraphs and illustrations 1 Combustion Air Inlet Diameter is 5 for Sizes 150 and 200 and 6 for Sizes 250 300 350 and 400 Use tin snips or aviation shears to cut out the hole in the top of the heater See Figure 2 Insert the pipe through the hole and attach it to the collar inside the heater Seal the joint Larger size heaters have oval ...

Page 6: ...lation Instructions for Option CC6 1 Determine the location on the outside wall for the vent terminal Applies to all horizontal vent kits In most applications the terminal would be on a level with the heater mounting height Allow 1 4 per foot downward pitch toward the terminal for draining of condensation The distance of the termination of the horizontal vent from adjacent public walkways adjacent...

Page 7: ...ght to the entire circumference of the pipe 3c Attach the outside portion of the combustion air pipe to the box Determine the length by measuring the bracket length if brackets are used plus the wall thickness plus 2 51 mm The inlet pipe should extend beyond the outside wall approximately 2 51mm Attach the inlet air pipe to the collar of the concentric adapter with sheetmetal screws being careful ...

Page 8: ...ature 53335 53335 450 F Silicone Sealant Side View Screened Exhaust Cap Inlet Air Guard Wall Vent Flue Exhaust Pipe Seal joints see Require ment No 5 on page 6 Combustion Air Pipe Seal Joints Concentric Adapter Maximum Length See Requirement No 4 on page 6 Minimum length is 5 ft 1 5M 60 1524mm maximum 12 305mm minimum Top View Worksheet Determine Length of Vent Pipe through the Box inches mm Heate...

Page 9: ...imum 11 279mm 18 457mm minimum Wall or Adjoining Building Flashing field supplied Roof Concentric Adapter Thimble 5 ft 1524mm maximum Size according to anticipated snow depth Side View X is the length of combustion air pipe required through and above the roof X must equal roof thickness plus clearance required for anticipated snow plus ridge and or parapet clearance X must not exceed 60 1524mm 6A ...

Page 10: ...Air from outside through duct openings 1 square inch free area per 2000 BTUH See 2 in Figure 7 3 Air direct from outside openings 1 square inch free area per 4000 BTUH See 3 in Figure 7 NOTE For further details on supplying combustion air to a confined space see the National Fuel Gas Code ANSI Z223 1a latest edition Aspacewhose volume is less than 50 cubic feet per 1000 BTUH of the installed appli...

Page 11: ...tor Adjoining building or parapet 6 ft 1 8m Adjacent public walkways 7 ft 2 1m above Grade ground level 7 ft 2 1m above heater manufacturer Option CC1 or a field supplied cap If the vent cap is field supplied use a Type L Breidert Air x hauster or equivalent vent cap Type L Air x hauster is a trademark of The G C Breidert Company Use of a vent cap supplied by the pipe manufacturer is not permitted...

Page 12: ...inet 45 1 8 1146mm 16 406mm Inlet Opening Requirements and Suggestions for Connecting and Installing Ducts Type of Ductwork The type of duct installation to be used de pends in part on the type of construction of the building Ductwork Material Rectangular duct should be constructed of not lighter than No 26 U S gauge galvanized iron or No 24 B S gaugealuminum Ductwork Structure All duct sections 2...

Page 13: ...y property damage or death Manifold or Orifice Pressure Settings Measuring manifold gas pressure cannot be done until the heater is in operation It is included in the steps of the Check Test Start proce dure in Paragraph 22 The following warnings and instructions apply WARNING Manifold gas pressure must never exceed 3 5 w c for natural gas or 10 w c for propane gas For Natural Gas Manifold gas pre...

Page 14: ...ili cone tubing from the static tap Remove the left section of the burner box cover 3 Determine which side of the cabinet will be most conve nient for the drain line Remove the hole plug on that side and insert the snap bushing from the package 4 Locate the hole in the bottom center of the burner pan and remove the plug Follow the instructions in Figure 14 to install the drain Complete all steps a...

Page 15: ...ld the sensing pressure is at the most negative level and as the heater and flue system warm up the sensing pressure becomes less negative After the system has reached equilibrium about 20 minutes the sensing pressure levels off If a restriction or excessive flue length or turns cause the sensing pressure to be outside the switch setpoint the pressure switch will function to shut off the main burn...

Page 16: ...ucing blower RPM or increasing duct system static pressure The chart below can be used for sizing line wiring but should not be interpreted as the exact motor amps See the motor rating plate for exact Full Load Amps Blower Motors Open HP 1 4 1 3 1 2 3 4 1 1 1 2 2 3 5 Direct Drive Motors 230V 1PH 6 3 208V 1 PH 2 1 3 2 5 1 6 3 7 5 8 3 10 0 230V 1PH 2 3 2 8 4 4 5 5 6 5 7 5 10 2 208V 3 PH 1 1 1 4 3 0 ...

Page 17: ...G PILOT OUTLET P MAIN BL PILOT M BR C OR PV TH TR TH OR BK BY PASS GAS VALVE HONEYWELL PILOT MV PLUG PILOT OUTLET MAIN TR OR PV MV AG1 AK2 OR AK3 CL10 DIRECT DRIVE BABS CAUA SERIES 150 400 DWG B 164607 REV 1 OPERATING SEQUENCE 1 SET THERMOSTAT SYSTEM SWITCH AT OFF POSITION FAN SWITCH AT AUTO POSITION 2 TURN ON MANUAL GAS VALVE 3 TURN ON POWER TO UNIT 5 THERMOSTAT CALLS FOR HEAT ENERGIZING THE VENT...

Page 18: ...UCTIONS NOTES 1 THE FOLLOWING CONTROLS ARE FIELD INSTALLED OPTIONS THERMOSTAT 2 DOTTED WIRING AND COOL RELAY COIL INSTALLED BY OTHERS 3 CAUTION IF ANY OF THE ORIGINAL WIRING AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 105 C EXCEPT FOR SENSOR LEAD WIRE WHICH MUST BE 150 C 4 USE 18 GA WIRE FOR CONTROL WIRING ON THE ...

Page 19: ...120 072 120 150 090 150 180 Burner Condensate Drain When a system includes a cooling coil a burner condensate drain must be installed The parts required for the drain are shipped with the heater Instructions for installing the drain are in Paragraph 10 page 14 Electrical Connections Model Size Connections ACUA 060 072 1 7 8 Suction Line 060 1 3 8 Liquid Line 072 1 1 2 Liquid Line 090 2 7 8 Suction...

Page 20: ... 16 6000 625 6 16 x 16 400 4300 448 6 16 x 16 5000 521 6 16 x 16 6000 625 6 16 x 16 Option CW4 with 2 Pleated Filters Option CW5 with 2 Permanent Filters Option CW6 for Field Supplied Filters Attaches on Either Side of the Heater Vertical Top or Horizontal Inlet Opening V Filter Rack Arrangement Filters for Options CW8 CW9 CW10 SizeCFM FPM 2 Filters Pleated Permanent 150 1800 375 2 12 x 32 4 12 x ...

Page 21: ... the potentiometer is to be field installed it is shipped in a separate carton Option Configuration GA1 Top Outside Air Opening with Dampers Rear or Bottom Return Air Opening without Dampers GA2 Rear Outside Air Opening with Dampers Top or Bottom Return Air Opening without Dampers GA3 Bottom Outside Air Opening with Dampers Top or Rear Return Air Opening without Dampers GA4 Bottom Outside Air Open...

Page 22: ...r may re sult in a fire or explosion Do not use this appliance if any part has been under water Immediately call a qualified ser vice technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water Operating Instructions and Operating Sequence 1 Set thermostat at lowest setting 2 Turn off all electric power to the appliance 3 This ap...

Page 23: ... after start up Vent System Testing Procedure Power Vent Units does not apply to separated combustion installation 1 Seal any unused openings in the venting system 2 Inspect the venting system for proper size and horizontal pitch as required in the National Fuel Gas Code ANSI Z223 1orCAN CGAB149 1andB149 2 InstallationCode for Gas Burning Appliances and Equipment and this manual Determine that the...

Page 24: ...ation All rights reserved Printed in the U S A MANUFACTURER OF HEATING COOLING AND VENTILATING SYSTEMS Trademark Note Reznor is registered in the United States and other countries 800 695 1901 www ReznorOnLine com 2 01 YL Form RZ 405 Version B ...

Reviews: