6.
Loosen the two screws on the extension tubes. Pull out the extension tubes of the two
stands to the desired height and fix both with the help of the locking screw on the stand.
7.
Mount up to eight effects or spot lights to the truss beam. Arrange the devices as bal‐
anced as possible. Observe the instructions of the respective manufacturers. The max‐
imum load capacity of 60 kg in total must not be exceeded.
8.
To dismantle the set proceed in the reverse order.
Installation
LB-3
19