Bellbrae | Installation Guide
9
7
After the post concrete has set slide the
top and bottom rails into the pre-routed
slots. You will need to push the rail all the
way into the first post to enable you to
push it into the second post.
Post 1
Post 2
8
Slide into the pre-routed slots on the post.
You will need to push the pickets all the
way into the first post to enable you to
push into the second post.
Post 1
Post 2
Please note:
The rails will have side to side
movement if the crimping marks are too far
apart. To combat this you can add screws to
the back of your posts hold the rails in place.