Bellbrae | Installation Guide
6
Prepare the site ensuring you don’t have any
significant undulations. You can then run two
string lines, one along the top of the posts
and one on the side of the posts.
Mark your post centers as required using line
marking paint. This is where you will auger/
dig the holes.
1
2
What you will need:
What you will need:
Post
Post
Post
Post
2390mm
2390mm
2390mm
String Line
String Line
Post
Please Note:
Think Fencing
recommends checking with location
services or contacting dial before you
dig to make sure it is safe to dig.