
IP66 NEMA/Type 4X -60
°°°°°
C
≤≤≤≤≤
Ta
≤
≤
≤
≤
≤
+55
°°°°°
C
Listed Heat Tracing Cable System 137M
Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx e II T4/T6
Ex e II T4/T6
0539 II 2 G & D EEx e II T4/T6 01ATEX0021995
Warnings
Due to the risk of electrical shock, arcing and fire caused by product
damage or improper usage, installation or maintenance, a ground-fault
protection device is required.
Installation must comply with Thermon requirements and be installed
in accordance with the NEC, CEC, or any other applicable national
and local codes.
Component approvals and performance ratings are based on the use of
Thermon specified parts only. User supplied power connection fittings
must be European certified for EEx e or UL Listed or certified for AEx e
(North America only).
De-energize all power sources before opening enclosure.
Keep ends of heating cable and kit components dry before and during
installation.
Kit Contents
1
2
Tools Required
Certifications/Approvals
1
2
4
5
3
6
7
8
9
11
10
2
1
Junction Box Lid
3
1
Junction Box Base w/ O-ring
4
1
Nut
5
1
Banding
6
1
RTV Tube
7
3
Power Connection Boots
8
1
Banding Guide
10
3
Ground Sleeves
Item Qty
Description
1
1
Expediter Assembly
Support Cap w/ O-ring
Threaded Grommet Compressor
Grommet
Support Base w/ O-ring
11
1
Junction Box Cord
9
1
Terminal Blocks w/ DIN Rail
(Refer to terminal specifications for maximum allowable wire size)