background image

Terminator ZP/FAK-1 

For Bulkhead Entry of 

Electrically Heated  

TubeTrace® Bundles

INSTALLATION PROCEDURES

Summary of Contents for Terminator ZP/FAK-1

Page 1: ...Terminator ZP FAK 1 For Bulkhead Entry of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES ...

Page 2: ...VSX HT PETK 2D for KSX HTSX PETK 3D for FP HPT Required Order Separately for each heater to be fabricated A mm inch B mm inch C mm inch D inch mm Terminator ZP FAK 1 220 mm 8 5 8 277 mm 11 7 8 107 mm 4 1 4 171 mm 6 3 4 D B A C 8 7 Terminator ZP FAK 1 Kit Contents Item Quantity Description 1 1 Expediter Assembly Flat Mount Base Grommet Threaded Grommet Compressor and Support Cap with O Ring 2 1 Jun...

Page 3: ...ndle as included from end of the tubing bundle Ensure sufficient heat trace is available for electrical connection See instructions included with heat trace PETK kit purchased separately 2a Strip back bundle insulation 38 mm 1 1 2 to 76 mm 3 beyond bus connection heat tracing If bus connection indentation is less than 305 mm 381 mm 12 15 from end of the heat tracing proceed stripping the bundle in...

Page 4: ...ket and work up over FAK ends FAK 1 Bottom Cover FAK 1 Top Cover RTV Sealant 12 Apply RTV bead to back of FAK 1 flange prior to securing to bulkhead RTV Bead Backside View Stainless Steel Bolts 14 Apply RTV bead around FAK 1 flange 13 Secure FAK 1 to bulkhead wall using 8 eight stainless steel bolts Note stainless steel bolts washers and nuts provided by others Recommended bolt size is 8 32 8 Asse...

Page 5: ... junction box base Align Slots Dimple for Center Line Drilled thru 1 Wall 21 Completed Terminator ZP FAK 1 for bulkhead entry of electrically heated TubeTrace bundles Power Connection Bulkhead 17 Install quick mount terminal blocks twist to position and tighten screws By others for power connection application Terminal Blocks Typical 18 Complete system wiring between fabricated heat tracing and po...

Reviews: