background image

2

1a. 

For  one  or  two  cables.  Locate  bus  connection 
(HPT and FP only) and cable as shown. Cut end 
of cable at angle to aid in piercing grommet. Leave 
additional cable for expansion loop. 

1b. 

Two cables.

Terminator

TM

 DS/DE

3. 

Slide  expediter  toward  pipe  and  route  cable 
through support base entry.

4. 

Insert banding guide into expediter and snap into 
place.

5. 

Mount expediter to pipe using pipe band. Do not 
band over cable.

2b. 

Two cables.

2a. 

For one or two cables. Insert cable into expediter. 
If mounted on bottom of pipe, punch out weep 
hole.

300 mm

(12")

300 mm

(12")

Reviews: