6
•
Operation
Page 112
Diode Array/Multiple-Wavelength Detectors (VC-D11, VC-D12, VF-D11)
Operating Manual
6.8.3
Restart after Long-Term Shutdown
To restart the device after a long-term shutdown, follow these steps:
1. Prepare and restart the other modules in the Vanquish system,
following the instructions in the
Operating Manuals
for the modules.
Pay special attention to the
Preparing the Module for Operation
section.
2. Flush the components in the flow path before the flow cell before
you connect the flow cell to the system flow path.
3. Connect the inlet capillary to the flow cell inlet and the waste line to
the flow cell outlet.
4. Turn on the device. Observe the following:
Situation
Action
If the device remained in the system
stack and all system modules were
turned off.
Turn on the system with the system
power button on the system base.
If the device is restarted after transport.
Turn on the device with the main power
switch.
5. Before starting an analysis, let the detector equilibrate and be sure
that it is ready for operation.