46
Surveyor RI Plus Detector Hardware Manual
Thermo Scientific
Index:
I
I
Initial power on
Inspecting your detector
Installation
checklist
positioning the detector
powering on
software
unpacking
Instrument window, opening
Integrator offset adjustment
Interconnect cable connection
L
Lamp adjustment
Lamp replacement
LEDs
described
troubleshooting
Light intensity adjustment
M
Main Menu window (figure)
Maintenance
cleaning external surfaces
cleaning the flowcell
preventive
recommendations
N
Nitric acid solution, cleaning flowcell
O
Operating range
Optical system
components of
theory of
unpacking
P
Parts, replaceable
Peak problems
Photodiode, movement of image on
Ports
connecting in and out
Ethernet
Positioning the detector
Power on detector
Purging flowcell
R
Recorder output adjustment
Refractive index
regulatory compliance
Repairing
Rise time, incorrect setting
S
safety standards
Screws, transport
Setup detector
Software installation
Solvent lines, connecting
Solvents
Stabilizing system
Surveyor RI Plus Detector, installing
T
Temperature fluctuations, results of
Transport screws
Troubleshooting
baseline random noisy
baseline spikes
broad tailing peaks
detector does not run
detector has no power
error messages
no peaks
no power
no run
smaller that expected peaks
tailing peaks
U
Unpacking your detector
V
Validation of accuracy
Summary of Contents for Surveyor RI Plus
Page 1: ...Surveyor RI Plus Detector Hardware Manual 60253 97000 Revision C January 2009...
Page 36: ......
Page 56: ......