5
Routine and Preventive Maintenance
Maintaining the Source Block Assembly
Thermo Scientific
Surveyor MSQ Plus Hardware Manual
89
Y
To clean the extraction cone and the source block
1. Disassemble the remaining components of the source block assembly:
a. Remove the hexapole screw insulator, extraction cone, and extraction cone insulator.
See
Figure 71.
Exploded view of the source block and its components
b. Remove the three O-rings:
• Top-left O-ring, 9.12 mm ID
×
3.53 mm THK, viton black
(P/N 00107-01-00047)
• Bottom-left O-ring, BS207, viton black (P/N FM101417)
• Right O-ring, BS225, viton black (P/N FM103048)
O-ring
BS207
O-ring
BS225
Extraction
cone insulator
O-ring,
9 mm ID × 3 mm THK
Extraction cone
with the cone facing the source block
Hexapole screw
insulator
CAUTION
When the extraction cone is not installed in the source block, store it
with its cone side facing upwards.
CAUTION
Because solvent and acid can damage the O-rings, do not sonicate them.