Installation procedure
Thermo Fisher Scientific
Smart-Vue 4-20 mA Module Installation Guide
9
Recommended order for
installing end-point
modules
In addition to placing your Smart-Vue end-point module as described above
for best wireless performance, you may also optimize overall network
performance by proceeding with installation as follows:
1. Examine the general layout of your site to determine the placement
of your Smart-Vue end-point modules. The extent of your
pre-installation site survey depends on the number of end-point
modules to install. Feel free to contact your sales representative for
more information on this topic.
2. Place all end-point modules in their final locations
before
running
wireless setup (described on page 11).
Begin activation by pressing on the end-point module’s push-button for 3
seconds (long-press), starting with the end-point modules closest to your
receiver, working your way “out” in concentric circles. This enables each
Smart-Vue end-point module to establish the optimal connection to your
receiver.
Figure 3.
Start installation with end-point modules closest to your
receiver and work your way “out” in concentric circles
Preparing mounting kit
with a magnet (optional)
Your Smart-Vue end-point module includes a plastic holder so you can
mount the device easily on various surfaces. In addition to the provided
screws, you will also find a magnetic pad with adhesive backing that you can
use to adhere the holder to most metal surfaces easily.