Chapter 14
SOP number: P0474/05/E - 02 May 2007
245
4. Column Installation
Install the test column as described in the
operating sequence following the instructions reported in:
•
•
Connecting to an PPKD Injector
5. Column Leak Check
Perform the column leak check following the he instructions reported in the
operating sequence.
6. Column Evaluation
For pressure controlled injector (such as Split/Splitless Injector), the indirect
control of the column flow by automatic pressure programming relies on the
calculation and pre-determination of a column constant. The column
evaluation is an automatic measurement of the column resistance that
determines the column constant.
NOTE
Column evaluation assumes there are no leaks in the column connection or gas plumbing lines.
Perform column evaluation following the instruction reported in the
operating sequence.
7. Column Conditioning
CAUTION
When performing column conditioning, the column should be connected only to the
injector leaving the column outlet disconnected to avoid the possibility of
contamination of the detector base body.
Column conditioning consists of passing a flow of carrier gas through the
column and heating it to a temperature of 20-50 °C above the maximum
temperature that will be used for running the analysis. For the test column the
working temperature is 350 °C. To perform column conditioning refer to
paragraph
8. Detector Connections
This operation should be carried out at the end of the column conditioning.
Connect the test column to the detector following the instructions reported in:
Summary of Contents for FOCUS GC
Page 4: ...iv InstructionManual ...
Page 70: ...Chapter 2 The FOCUS GC User Interface Info Diagnostics 70 Instruction Manual ...
Page 92: ...Chapter 4 Column Oven Oven Parameters 92 Instruction Manual ...
Page 124: ...Chapter 6 Purged Packed Column Injector PPKD PPKD Injector Menu 124 Instruction Manual ...
Page 170: ...Chapter 8 Flame Ionization Detector FID Detector Signal Parameters 170 Instruction Manual ...
Page 186: ...Chapter 9 Thermal Conductivity Detector TCD Detector Signal Parameters 186 Instruction Manual ...
Page 242: ...Chapter 13 SOP number P0473 04 E 02 May 2007 242 Instruction Manual ...
Page 336: ...Chapter 16 LAN Option Set up Set Up 336 Instruction Manual ...
Page 344: ...Glossary 344 Instruction Manual C min 1 instead of C min g L 1 instead of g L ...
Page 350: ...Index 350 Instruction Manual ...