2
Maintaining the DSQ II
Maintaining Components Outside the Vacuum Manifold
112
DSQ II Hardware Manual
Thermo Scientific
6. Reinstall the RF generator board.
a.
Reconnect the P2 cable.
b. Insert the RF generator board.
c.
Reattach the screws that hold the RF generator board in place.
d. Reconnect the P1, J1, J2, and J3 cables.
7. Reattach the left, top, and front covers of the DSQ II.
8. Restart the DSQ II.
Replacing the Transfer Line
To replace the transfer line, you will need:
• Gloves, clean, lint- and powder-free
• New Transfer line
• Wrench, Allen, 3 mm
• Wrench, open-ended, 5/16-in.
• Wrench, two, open-ended, 7/16-in.
1. Cover the work area with a lint-free cloth.
2. Shut down and vent the DSQ II, as described in
"Shutting Down the GC/MS System"
.
3. Remove the front, top and right covers, as described in "
Removing the Right Cover" on page 27
4. Shut down the TRACE GC.
5. Remove the transfer line.
WARNING - ELECTRICAL SHOCK HAZARD.
Before proceeding. unplug the DSQ II to
avoid an electrical shock.
WARNING - BURN HAZARD.
The transfer line may be hot. Allow it to cool to room
temperature before touching it.
Summary of Contents for DSQ II
Page 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Page 4: ......
Page 8: ......
Page 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Page 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Page 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Page 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Page 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...