ICS-2000 Ion Chromatography System
B-34
Doc. 031857-03 4/06
B.13.2 Priming the Pump Heads with the Prime Button
NOTE Perform this procedure after priming the eluent
1. Check that the priming valve on the primary pump head is closed (see
2. Open the waste valve on the secondary pump head by turning the
knob one-quarter to one-half turn counterclockwise (see
). Opening the valve directs the eluent flow path to waste
and eliminates backpressure.
3. Touch
Prime
on the ICS-2000 touch screen
HOME
page. Confirm that
the waste valve is open by pressing
OK
when the reminder message
appears. The pump will begin pumping at approximately 3 mL/min.
4. Continue priming the ICS-2000 until no air bubbles are exiting the
pump waste line.
5. Press
Pump
Off
.
6. Close the waste valve.
Do not overtighten.
The pump is now ready
for operation.
7. Go on to
NOTE If the two standard priming procedures described
above are unsuccessful, prime the pump with
isopropyl alcohol. See
Figure B-29. Priming the Pump
Priming Valve
Waste Valve
Primary
Pump Head
Secondary
Pump Head
(open)
(close)
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...