ICS-2000 Ion Chromatography System
B-32
Doc. 031857-03 4/06
B.13.1 Priming the Eluent Lines with a Syringe
NOTE Prime the eluent lines after initial installation, after
changing eluents, or when eluent lines are empty.
1. Verify that the pump is turned off.
2. Connect a 10 mL syringe (P/N 054578) to the port in the priming
valve on the primary pump head (see
3. Open the priming valve by turning it one-quarter to one-half turn
counterclockwise.
4. On the ICS-2000 touch screen, touch the page name (for
example,
) in the bottom right corner to open a menu
of pages.
Figure B-27. Priming the Eluent Lines
10 mL Syringe
(P/N 054578)
Priming Valve
(open)
Port
Waste Valve
(close)
Primary
Pump Head
Secondary
Pump Head
Summary of Contents for Dionex ICS-2000
Page 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Page 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Page 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Page 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Page 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Page 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...