background image

Lapp Automaatio Oy 

Martinkyläntie 52 
FI-01720 Vantaa 
Email: [email protected]  

Tekninen myynti/Technical sales: 

P: +358 (0)20 764 6410 
 
Avoimet tilaukset/Open orders: 
P: +358 (0)20 764 6420 
 

Kotipaikka/Domicile 

Vantaa 
 
Y-tunnus: 1107293-1  
VAT: FI11072931 
 

Lapp Automaatio on osa LAPP Groupia 
A Lapp Group Company

 

 
Lapp Insulator ei ole osa LAPP Groupia 
Lapp Insulator is not affiliated  
with the LAPP Group 
 

 

 
 
 
  
 
 
 

 

 

 

IoTKey

®

 - Quick Start Guide 

EN-2020-01-21

 

 

Please refer the below numbers to equivalent images on page 2. 

 

IoTKey

®

 Gateway 

 

 

1. 

Plug in the antennas at the gateway device’s rear panel as shown in the picture: two mobile data 
antennas to the upper corners (CELL/AUX) and one LoRa antenna to the lower connector (RF/AP2). 

2.  Insert the mobile data SIM card, if needed. Depending on your order, the SIM card can already be in 

place, or you can add it yourself later. The SIM card slot is located at the front of the device, under the 
name plate. The SIM card should be a mobile data (3G/4G) card, size Mini (the largest size). 

3.  Connect the gateway power supply cable to the rear panel connector (- +). The device starts up 

immediately after getting power, and will be ready for use within a few minutes, depending on the set 
measurement interval. 

 
 

IoTKey

®

 Transmitter 

 

4.  Connect the antenna, if delivered disconnected. Carefully screw in the nut to the transmitters SMA 

connector.  

5. 

a) Enclosure types D/W/H and Bocube

: Open the enclosure for powering the transmitter. Either 

connect external voltage to connector (Supply) or ensure that the battery is correctly inserted in the 
battery holder; positive pole of the battery is at the end of red wire.  

 

b) Enclosure type ATEX XD

: Do not open the enclosure when potentially explosive gas/dust mix is 

present! Otherwise, follow the instructions given above, see list item 5. a).

 

6. 

a) Enclosure types D/W/H and Bocube

: When delivered, the transmitter battery cable is 

disconnected to extend the battery lifetime. Connect the battery cable (red and black wire, white 
connector) to the transmitter’s 2-pin connector (Battery). 

 

b) Enclosure type ATEX XD

: When delivered, the transmitter fuse is disconnected to extend the 

battery lifetime. The fuse is inside the transmitter enclosure. Attach the fuse and place the cover plate 
on top. 

If the transmitter is subsequently not used for an extended period, it is advised to disconnect 
the battery cable / fuse to extend the battery lifetime.  

7.  After the transmitter is powered, it starts connecting with the gateway according to configurations. It 

may take a few minutes for the transmitters to connect, but once the connection is ready, the 
measurement data is sent automatically. 

 

8.  The ordered sensors are pre-installed in the applicable connectors (S1/S2/AUX) of the transmitter. 

 
 

IoTKey

®

 Portal 

 

9. 

The contact person named in the order, has been granted a user ID (email address) to IoTKey® Portal, 
the cloud-based service for data monitoring. Please follow the link sent to the email address given in 
the order, to create your password. When logging in for the first time, you will be asked to read and 
accept the licence agreement. After your first login, please go directly to https://iotkey.lappautomaatio.fi 
and click on the login link at the upper right corner of the browser window. Fill in your user ID and 
password, and follow the instructions given in the 

“USER MANUAL IoTKey® Portal – cloud-based 

service web UI

”.

 

 

Reviews: