Dionex ICS-1100 Ion Chromatography System
112
Doc. 065289-03 10/12
12. Align the new valve on the component panel with the liquid ports facing up
and attach it with the two screws removed in
. Reconnect the liquid
lines.
13. Turn on the power to the Dionex ICS-1100.
14. Prime the pump (see
5.15 Replacing the Leak Sensor
1. Turn off the power to the
Dionex ICS-1100.
2. Open the Dionex ICS-1100
front door.
3. Loosen the screw on the front of
the leak sensor (see
Note:
The screw
remains attached to the sensor.
Figure 5-21. Leak Sensor
4. Remove the leak sensor from
the component panel and pull
the cable out of the opening in
the panel.
5. The cable attached to the leak
sensor is connected to a
matching cable inside the
Dionex ICS-1100. Continue
pulling the cable until the
connectors for the two cables
are outside of the panel (see
6. Disconnect the two cables.
Figure 5-22. Leak Sensor Cable
Leak
Sensor
Loosen
Screw
Disconnect
Cables
Summary of Contents for Dionex ICS-1100
Page 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Page 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Page 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Page 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Page 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Page 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Page 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Page 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...