i
CONTENTS
SECTION
PAGE
I. SAFETY SECTION
1
A.
CODES
AND
CLEARANCES 3
B. MAKE-UP AIR
4
II.
GENERAL
INSTRUCTIONS
5
A. CHIMNEY
6
B. VENTING
10
C.
DRAFT
REGULATORS
11
D.
DUCT
WORK/AIR
CONDITIONING
11
E. AIR FILTER(S)
15
F.
LIMIT
POSITION
AND
LOCATION
17
G.
BURNER
INSTALLATION
18
H.
BURNER
SPECIFICATIONS
AND
APPLICATIONS
19
I.
OILTANK
AND
PIPING
22
J. OIL FILTER
23
K.
ELECTRICAL
WIRIING
23
L.
BLOWER
SETUP
27
M. BLOWER CONTROLLER INFORMATION FOR PSC MOTOR
35
N.
STARTUP
PROCEDURES
40
III.
USERS
INFORMATION
SECTION
48
A. OIL SUPPLY
48
B.
COMBUSTION
AIR
SUPPLY 48
C.
INSPECTION
AREAS
48
D.
STARTING
THE
BURNER
49
E.
FILTER
CLEANING
AND
LOCATION 49
IV.
INSTALLER'S
INSTRUCTIONS
TO
USER
50
V. DEALER MAINTENANCE
51
A.
GENERAL
INSPECTION
51
B.
HEAT
EXCHANGER 52
C.
HEAT
EXCHANGER
CLEANING
INSTRUCTIONS
52
D.
ELECTRICAL
SYSTEM
54
E.
SUPPLY/RETURN
AIR
BLOWER
54
F.
SUPPLY/RETURN
AIR
FILTER
54
G.
EXTENDED
APPLIANCE
SHUTDOWN
55
VI. HOMEOWNER/USER INFORMATION AND ROUTINE MAINTENANCE
56
VII.
TROUBLESHOOTING
58
A. DIAGNOSTICS
59
B. CAD CELL CHECK-OUT PROCEDURE
59
VIII. SEQUENCE OF OPERATIONS FLOW CHART
61
IX.
TROUBLE
SHOOTING
FLOW
CHART
63
APPENDIX – A
REPLACEMENT
PARTS
LIST
69
APPENDIX – B
WIRING
DIAGRAMS
71
WARRANTY
76
Summary of Contents for Thermo Pride OH6FA072D48B
Page 5: ...2...
Page 33: ...30 Heating Speed Set ups 2 Stage OH6FX072DV4 Figure 18 2 ECM 2 stage blower motor speed chart...
Page 64: ...61 VIII Sequence of Operations Flow Chart...
Page 65: ...62...
Page 66: ...63 IX Trouble Shooting Flow Chart...
Page 67: ...64...
Page 68: ...65...
Page 69: ...66...
Page 70: ...67...
Page 72: ...69 Appendix A Replacement Parts Replacement Parts for OH6FA072D...
Page 73: ...70 Replacement Parts for OH8FA119D...
Page 74: ...71 Appendix B Wiring Diagrams OH6FA072D48 PSC Wiring Diagram...
Page 75: ...72 OH6FA072DV4 ECM Wiring Diagram...
Page 76: ...73 OH6FX072DV4 ECM 2 Stage Wiring Diagram...
Page 77: ...74 OH8FA1119D60 PSC Wiring Diagram...
Page 78: ...75 OH8FA1119DV5 ECM Wiring Diagram...
Page 79: ...76...