background image

All installations and services must be performed by qualified service personnel. 

10 

E.  FILTER CLEANING AND LOCATION: 
The air filters should be inspected each month and cleaned when dirty. Cleaning the air filters frequently may reduce 
airborne contaminants from entering the furnace and depositing in the furnace, duct system and home. 
 

c

WARNING:  To avoid injury from moving parts, hot surfaces, or electrical shock, shut 

off  the  power  to  the  furnace  before  removing  any  furnace  access  doors  to  service  the  air 
filters. 

 

 

The filter rack will be located between the return air plenum and the return air opening on the side of the furnace, 
refer to figure 8. Slide the dirty filter out, clean it with a mild soap and water solution. Make sure filter is thoroughly 
dry before replacing.  

Fig. 8: Location of the air filter on the typical highboy furnace. 

Summary of Contents for Spirit VHF-ABE

Page 1: ...nce Improper installation adjustment alteration service or maintenance can cause a fire or explosion resulting in property damage personal injury or loss of life For assistance or additional informati...

Page 2: ...ry substantial property damage or death See Page 5 cWARNING THE HEAT EXCHANGER MUST BE CLEANED BY A QUALIFIED SERVICE PERSON See Page 8 cCAUTION DO NOT ATTEMPT TO MAKE REPAIRS YOURSELF See Page 9 cWAR...

Page 3: ...RETURN AIRFLOW AND AIR TEMPERATURE 3 D FILTERS MOUNTED EXTERNAL TO FURNACE 4 E LIMIT POSITION AND LOCATION 5 F BURNER INSTALLATION 6 G BURNER SPECIFICATIONS AND APPLICATIONS 7 H HEAT EXCHANGER CLEANI...

Page 4: ...located or protected to avoid physical damage by vehicles cWARNING This furnace is not to be used as a construction heater 5 Listed below are definitions of COMBUSTIBLE MATERIAL and NON COMBUSTIBLE MA...

Page 5: ...power venter manufacturer to design and assemble a satisfactory power vent system A VENTING NOTE On the VHF A it is possible to rotate the flue elbow which is factory installed for vertical discharge...

Page 6: ...tioning cooling the furnace should be installed parallel with or on the upstream side of the evaporator coil to avoid condensation in the furnace heat exchanger If the cooling unit is installed with a...

Page 7: ...essary to cut the return air opening in the side or rear casing depending upon the needs of the specific installation The filter rack provided with the furnace refer to Fig 2 will serve as a template...

Page 8: ...ange of the filter rack Connect the return air plenum to the filter rack and slide the filter into place Dimensions for adapting the return air plenum to the filter rack are provided See Fig 2 E LIMIT...

Page 9: ...ig 4 This retainer secures the chamber during shipping and helps to maintain insertion depth DO NOT remove this retainer when installing burner Fig 4 Typical location of the overfire air tap and compo...

Page 10: ...CONE FOR EXAMPLE A NOZZLE RATED AT 0 65 GPH 100 PSIG THAT PROVIDES AN 80 SPRAY ANGLE AND A HOLLOW SPRAY PATTERN WOULD BE ABBREVIATED IN THE TABLE AS 0 65 X 80 A For more specific burner information c...

Page 11: ...With access to the inside of the heat exchanger through the burner area clean out openings and vent pipe connection it is possible to use a long flexible wire brush and an industrial type vacuum clean...

Page 12: ...discoloration of materials and damage from rust or corrosion FLUE PIPE VENT PIPE OR CONNECTOR The furnace vent pipe should be inspected for signs of rust corrosion pitting or holes in pipe and leakage...

Page 13: ...ystem and home cWARNING To avoid injury from moving parts hot surfaces or electrical shock shut off the power to the furnace before removing any furnace access doors to service the air filters The fil...

Page 14: ...MASONRY CHIMNEY W METAL LINER FUEL LINE FILTER DRAFT CONTROL COMBUSTION TESTS Operate burner at least 10 minutes before CO2 in stack pipe INITIAL SERVICE SERVICE SERVICE INSTALLATION Draft Over fire D...

Page 15: ...All installations and services must be performed by qualified service personnel 12 APPENDIX A Replacement Parts List...

Page 16: ...All installations and services must be performed by qualified service personnel 13...

Page 17: ...All installations and services must be performed by qualified service personnel 14...

Page 18: ...All installations and services must be performed by qualified service personnel 15...

Page 19: ...All installations and services must be performed by qualified service personnel 16 APPENDIX B Wiring Diagrams BLOWER SPEED TAPS COOL A C Tap HEAT Heating Tap LOW Constant air or Dehumifier...

Page 20: ...All installations and services must be performed by qualified service personnel 17...

Reviews: