3. Load the product so that there is adequate
space for air circulation completely around the
load. DO NOT block the evaporator inlet or
outlet.
4. Products should be pre-cooled before loading.
Thermo King transport refrigeration units are
designed to maintain loads at the temperature
at which they were loaded. Transport
refrigeration units are not designed to pull hot
loads down to temperature.
Single Temperature Loading
Procedure
If all compartments are to be maintained at the
same temperature and all evaporators are required
to operate, it is recommended that the dividing
bulkhead doors be closed to allow correct
temperature management in each compartment.
Some loads require that the bulkheads be
removed. In that case, run the Zone 1 and Zone 2
evaporators to control the temperature. Make sure
the setpoints for Zone 1 and Zone 2 are exactly
the same.
Post Load Procedure
1. Make sure all the doors are closed and locked.
2. Start the unit if it was shut off to load (see
“Restarting Unit”).
3. Make sure the setpoints are at the desired
settings.
4. One-half hour after loading, manually initiate
defrost cycles in each compartment. If the
evaporator coil sensor temperature is below
45 F (7 C), the evaporator will defrost. The
microprocessor will terminate defrost
automatically when the evaporator coil
temperature reaches 58 F (14 C) or the
evaporator has been in the Defrost mode for
30 or 45 minutes (depending on setting).
Post Trip Checks
1. Wash the unit.
2. Check for leaks.
3. Check for loose or missing hardware.
4. Check for physical damage to the unit.
Summary of Contents for Spectrum DE 30-2
Page 4: ...4...
Page 12: ...Safety Precautions 12...
Page 16: ...Specifications 16...
Page 31: ...Unit Description 31 1 Access Panels 2 Defrost Dampers Figure 12 Back View of Unit 1 2 AGA215...
Page 42: ...Operating Instructions 42...
Page 48: ...Electrical Maintenance 48...
Page 106: ...Structural Maintenance 106...
Page 110: ...Mechanical Diagnosis 110...
Page 114: ...Remote Evaporator Specifications 114...
Page 116: ...Remote Evaporator Maintenance Inspection Schedule 116...
Page 122: ...Remote Evaporator Electrical Maintenance 122...
Page 126: ...Remote Evaporator Refrigeration Service Operations 126...
Page 128: ...Remote Evaporator Structural Maintenance 128...
Page 130: ...Remote Evaporator System Diagnosis 130...
Page 134: ...Wiring and Schematic Diagrams Index 134...
Page 135: ...135 Schematic Diagram Page 1 of 2...
Page 136: ...136 Schematic Diagram Page 2 of 2...
Page 137: ...137 Wiring Diagram Page 1 of 4...
Page 138: ...138 Wiring Diagram Page 2 of 4...
Page 139: ...139 Wiring Diagram Page 3 of 4...
Page 140: ...140 Wiring Diagram Page 4 of 4...