
VENTUM HYDRONIC AIR-HANDLER
Installation and Operation Manual (Revised: June 2021)
13
Figure 8: Electrical diagram with digital controller
Table 7 : Legend of available connections
Terminal
Description
L1
120 VAC power supply (line)
N
120 VAC power supply (neutral)
GND
Grounding
W1
First stage or zone 1 heating request signal (24VAC)
W2
Second stage or zone 2 heating request signal (24VAC)
Y1
First stage or zone 1 air conditioning request signal (24 VAC)
Y2
Second stage or zone 2 air conditioning request signal (24 VAC)
G
Fan demand signal (24 VAC)
R
24 VAC signal circuit power supply to the thermostat
C
24 VAC common for continuous supply of the thermostat or 24 VAC accessories
O/B
Heat pump 3-way valve supply signal (24 VAC)
HUM
Dehumidification request signal (24 VAC)
Y out
Air-conditioning request signal to the outdoor air conditioning unit
W out
Heating demand signal to the outdoor unit or boiler
Aux
Authorization to start the auxiliary boiler (dry contact)
Aux
Authorization to start the auxiliary boiler (dry contact)
Not Zone 1*
24VAC contact supplied when no request OR request for zone 1
Not Zone 2*
24VAC contact supplied when no request OR request for zone 2
*The "Not Zone 1" and "Not Zone 2" contacts are accessible directly on the green 7-pole connector located on the back of the
controller. No indications are present for these contacts. These contacts can be useful when the VenTum is used in "zone"
mode and you want to connect motorized shutters to it.
Summary of Contents for VENTUM
Page 18: ...VENTUM HYDRONIC AIR HANDLER Installation and Operation Manual Revised June 2021 18 ...
Page 19: ...VENTUM HYDRONIC AIR HANDLER Installation and Operation Manual Revised June 2021 19 ...
Page 20: ...VENTUM HYDRONIC AIR HANDLER Installation and Operation Manual Revised June 2021 20 ...
Page 32: ...COOLING COIL COMPATIBILITY LISTING ...
Page 33: ......
Page 34: ......