thermital TBPS  KOMPACT Series Installation And Maintenance Manual Download Page 8

8

ENGLISH

INSTALLATION

INSTALLATION

UNPACKING THE PRODUCT

T

 

TBPS KOMPACT

 solar heaters are supplied in a 

single package on a wooden pallet.

The boiler comes with a solar station supplied with solar reg-

ulator already wired to the high-efficiency circulator, and two 

non-wired probes to be inserted in the boiler sockets.

The following items are delivered in a plastic bag inside the 

packaging:

- Instruction manuals

- Bar code label

- Hydraulic test certificate

- Energy label (to be applied to device upon installation)

- No. 1 solar probe PT1000

- No. 2 probes NTC.

The instruction manual is an integral part of the solar stor-

age cylinder. Once located, read it thoroughly and keep 

it safe.

For handling operations, thoroughly follow the instruc-

tions on device package label.

ACCESS TO THE SOLAR STATION

To access the solar station it is necessary to remove the solar 

regulator covering (1) and then the front insulation (2).

1

2

PLACE OF INSTALLATION

T

 

TBPS KOMPACT

 storage cylinders can be in-

stalled in any room where there is no specific requirement for 

an electrical protection rating higher than IP X0D.

≥ 0,3 m

≥ 0,8 m

≥ 0,3 m

≥ 0,8 m

≥ 0,7 m

NOTE:

 the above-indicated dimensions are recommended for 

a correct maintenance and access to the device.

When installing the boiler, allow sufficient space around 

it to access all safety and control devices and to permit 

easy maintenance.

INSTALLATION IN OLDER SYSTEMS AND 

SYSTEMS REQUIRING MODERNISATION

When installing 

T

 

TBPS KOMPACT

 storage cylin-

ders in old systems or systems requiring modernisation, al-

ways perform the following checks.

- Make sure that the system is fitted with safety and con-

trol devices in accordance with applicable legislation 

and standards

- Make sure that the central heating circuit has been 

flushed out to remove all sludge and lime scale, and 

has been vented and seal tested

- Make sure that a suitable water treatment system is 

installed if the quality of the supply/recirculation water 

so demands (refer to the reference values listed in the 

table alongside).

WATER QUALITY REQUIREMENTS

REFERENCE VALUES

pH

6-8

Electrical conductivity

less than 200 μS/cm (25°C)

Chlorine ions

less than 50 ppm

Sulphuric acid ions

less than 50 ppm

Total iron

less than 0.3 ppm

Alkalinity M

less than 50 ppm

Total hardness

less than 35°F

Sulphur ions

none

Ammonia ions

none

Silicon ions

less than 30 ppm

The values above ensure proper operation of the system. Refer 

to the limit values specified in the current standards and regu-

lations on the installation site.

Installation

Summary of Contents for TBPS KOMPACT Series

Page 1: ...TBPS KOMPACT INSTALLATION AND MAINTENANCE MANUAL...

Page 2: ...EN 12897 ENGLISH CONTENTS The following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This m...

Page 3: ...t immediately Keep the product purchase documents to be presented to the T authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as to ensu...

Page 4: ...Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management control Manages 9 system diagrams that can be selected Re fer to the specific manual for further details IDEN...

Page 5: ...t in non return valve 2 Delivery Valve solar plant delivery with built in non re turn valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirec...

Page 6: ...1 33 W K Energy class B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 36 kW 400 572 890 l...

Page 7: ...ccumulation tank lower part 70 C 374 438 659 l 60 C 284 375 531 l 50 C 205 310 390 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Page 8: ...sions are recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maint...

Page 9: ...y diameter length of magnesium anode 1 33 450 1 33 450 1 33 520 mm DF Flange internal diameter 130 130 130 mm A 1120 1420 1270 mm B 171 171 208 mm C 403 393 427 mm D M8 threaded inserts for grounding...

Page 10: ...ve an omnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the prevail ing standards of the installation country respect the polarity of the L1 Phase N Neutral con necti...

Page 11: ...robe cable together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any...

Page 12: ...on valve VR counter clockwise Close taps A and B b During system flushing pay attention to water coming out of the taps as vapour could be released with risk of burns or scalds Use suitable personal p...

Page 13: ...air bubbles have been eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Star...

Page 14: ...d E Move away any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the...

Page 15: ...supplied with the product End user TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C...

Page 16: ...35017 Piombino Dese PD www thermital it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore l...

Reviews: