COMMISSIONING AND MAINTENANCE

COMMISSIONING AND MAINTENANCE

INTERVENTIONS ON THE HYDRAULIC 

SYSTEM

Draining the system

- Connect a rubber hose to taps (A) and (B)

- Connect the opposite end to a vessel

- Open system drain taps and allow full drainage

- Close system drain taps and remove the rubber hose

- The exhausted heat transfer fluid must be disposed of 

according to the prevailing regulations, pursuant to the 

instructions provided in the safety data sheet supplied 

with the glycol.

Disassembling the circulator

Remove the circulator when system has cooled down.

Before removing circulator (C):

- Cut power off to the solar station and to the connected 

integration system, by setting the system's main switch 

and the device's main switch to OFF

- Disconnect circulator power by removing connectors 

(D) and (E)

- Move away any wiring and electric devices below to 

protect them against any leakage of heat transfer fluid

- Close valves (VR) and (VM) by turning handle clock-

wise by 90°

- Open taps (A) and (B) and drain the solar circuit

- Loosen ring nuts (H1) and (H2) and remove circulator 

(C).

C

H2

H1

B

VM

VR

E

D

A

Reverse the above steps to fit the new pump.

Fill the solar circuit as described in paragraph "System filling 

cock".

RECYCLING AND DISPOSAL

The device is primarily composed of:

Material

Component

steel

structural work

metal materials

tubes, circulator

ABS (acrylonitrile-butadi-

ene-styrene)

solar regulator casing, cover-

ing and covers

PPE (polypropylene foam)

solar station insulation

PU (polyurethane)

boiler insulation

synthetic rubber

pipe insulation

electrical and electronic 

components

cables and wiring, solar 

regulator, circulator

At the end of the device's useful life, these components must 

be separated and disposed of according to current regula-

tions in the country of installation.

Commissioning and maintenance

Summary of Contents for TBPS KOMPACT Series

Page 1: ...TBPS KOMPACT INSTALLATION AND MAINTENANCE MANUAL...

Page 2: ...EN 12897 ENGLISH CONTENTS The following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This m...

Page 3: ...t immediately Keep the product purchase documents to be presented to the T authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as to ensu...

Page 4: ...Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management control Manages 9 system diagrams that can be selected Re fer to the specific manual for further details IDEN...

Page 5: ...t in non return valve 2 Delivery Valve solar plant delivery with built in non re turn valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirec...

Page 6: ...1 33 W K Energy class B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 36 kW 400 572 890 l...

Page 7: ...ccumulation tank lower part 70 C 374 438 659 l 60 C 284 375 531 l 50 C 205 310 390 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Page 8: ...sions are recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maint...

Page 9: ...y diameter length of magnesium anode 1 33 450 1 33 450 1 33 520 mm DF Flange internal diameter 130 130 130 mm A 1120 1420 1270 mm B 171 171 208 mm C 403 393 427 mm D M8 threaded inserts for grounding...

Page 10: ...ve an omnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the prevail ing standards of the installation country respect the polarity of the L1 Phase N Neutral con necti...

Page 11: ...robe cable together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any...

Page 12: ...on valve VR counter clockwise Close taps A and B b During system flushing pay attention to water coming out of the taps as vapour could be released with risk of burns or scalds Use suitable personal p...

Page 13: ...air bubbles have been eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Star...

Page 14: ...d E Move away any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the...

Page 15: ...supplied with the product End user TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C...

Page 16: ...35017 Piombino Dese PD www thermital it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore l...

Reviews: