Panel installation
34/48
- Detail of Pt 1000 probe installation at panel outlet:
Position of probe at panel outlet
Note the probe (that can be recognized by the grey silicone cable) must be installed
in the thermowell of the T fitting, on the hot outlet. If there are several batteries of
panels connected to each other, the probe must be positioned on the hot outlet of
the last battery from which the hot delivery line to the heating system starts. The
probe itself must be inserted so that it touches the bottom of the well, taking care to
secure it in place using the tightening nut included in the fitting. If the probe is
installed Incorrectly, the temperature readings may be incorrect, making the system
inefficient.
- Detail of connecting panels with straight compression fitting:
Important The tightening of the panels to the bracket kits must be done only after
the panels have been connected (as shown in the figure) using the nipples already
supplied and positioned on the collector.
Summary of Contents for 10 DTH V2
Page 1: ...Code 8TAV00005 INSTALLATION MANUAL 10 DTH V2 Forced circulation systems ...
Page 8: ...Panel description 8 48 Pressure drop ...
Page 17: ...Panel installation 17 48 Series of collectors connected with Tichelman reverse return system ...
Page 20: ...Panel installation 20 48 ...
Page 21: ...Panel installation 21 48 ...
Page 25: ...Panel installation 25 48 m Flat roof installation with trestle ...
Page 29: ...Panel installation 29 48 n Installation with brackets ...
Page 30: ...Panel installation 30 48 ...
Page 44: ...44 48 ...
Page 45: ...45 48 ...
Page 46: ...46 48 ...
Page 47: ...47 48 ...