6
Water Supply and Drain Pan
THERMASOL.COM
I
800.776.0711
Read warnings on page 2. For illustrative purposes only. Consult with qualified professional for steam room construction details.
Once you select the generator location,
you will need to run water to the unit.
DO NOT use galvanized fittings. Use copper or brass fittings only!
DO NOT use PEX or PVC tubing.
DO NOT plumb the pressure relief valve into the steam line.
Plumbing the pressure relief valve into the steam line can be
hazardous, should the steam outlet be capped off or obstructed.
Recommend installing unions on all rigid pipe lines for ease of
removal and serviceability (if required).
Use 3/8" NPT line.
Plumb the 3/4" drain connection on pan to an approved drain.
Drain Pan must be installed on all generator installations.
All plumbing shall be performed by a qualified
licensed plumber and in accordance with
applicable national and local codes.
Connect a tee to the existing cold water line.
Install copper pipe from the tee to create inlet line for unit.
Install a brass shut off valve on the water inlet line
in an accessible area in front of the brass union (and
recommended in-line water filter). A stainless steel water
supply flex connector may be used.
Before making the water connection, flush the water line
into a five-gallon pail to remove any silt or other materials that
may be in the water inlet line.
Make final connection but DO NOT turn the water on yet.
A
D
B
E
C
A
D
B
E
C
Steam Suite Spa Package
Water Inlet Line
(3/8" NPT with brass
shut-off valve)
3/4" Drain Line
Steam Line
5
BY THERMASOL