INSTALLATION
5.1 Handling he
d c
S la i i a hea
d c , and ca e h ld be aken hen ca
ing he b ile he
m he e i i g ing
be in alled. The al eigh f each b ile i indica ed in echnical da a ec i n. Ca
ing e i men f
he
d c m
be f en gh ca aci
ha eigh . T a id damage d ing an
, b ile
h ld be m ed i h f klif an ale . U e he an
fee n he
den alle .
NOTICE Da age
e
•
D n e ha d and ha bjec hile em ing he ackage a
nd he b ile e en
damage f he ain ed jacke .
5.2 R m elec i n
B ile m
be in alled in an indi id al b ile
m a ic la l gani ed f hea ing. The b ile
m
h ld be f en gh l me f in alla i n, fi ing, and main enance f he b ile . The e h ld be en gh
f e h ai ci c la i n f c mb
i n, he chimne de ign m
en
e an de a e d a gh f ela ed b ile
e, and m
c m l i h c n
c i n c i e ia gi en f
he in hi man al and in manda
eg la i n .
Y
b ile m
ne e bein alled in
en ace balc nie , in ace cc ied b e le like ki chen,
li ing
m, ba h
m, bed
m, in ace he e he e a e e l i e and c mb
ible ma e ial .
The b ile
m h ld ha e ai en illa i n h le h
gh
ide le f e h ai in. One ai en illa i n h le
m
be b il ma im m 40 cm bel
he le el f
m ceiling, he he m
be b il ma im m 50 cm
ab e he fl
le el. The e en illa i n h le h ld al a be ke
en. The
e h le h ld be a
lea 40 40 cm in i e, he l
e h le a lea 30 30 cm. All h d a lic and elec ical ci c i m
be
a anged b a h i ed
aff in acc dance
i h manda
eg la i n
ecified b legal
gani a i n .S lid f el h ld be
ed b kee ing minim m 800 mm di ance f m he b ile . We
ec mmend
kee he lid f el in an he
m. B ile h ld be in alled n a c nc e e lin h made
f a fi e
f ma e ial. F minim m i e f he lin hf ll
ing able h ld be efe ed
M del
SLS-18
SLS-25
SLS-32
SLS-40
SLS-50
Plin h heigh
mm
50
Plin h id h
mm
550
600
700
Plin h leng h
mm
850
900
1100
5.3 Clea ance a
nd b ile
A lea he f ll
ing clea ance (in mm) h ld be achie ed a
nd he b ile :
Summary of Contents for SOLARIS SLS 18
Page 1: ...I a a i a d U e Ma a ...
Page 10: ...SLS SLS ...