10
INSTALLATION
2.3 INSTALLATION
Location
The power supply is shipped with the torch and torch
leads, control cable, and work cable connected. The
following steps are required to complete installation.
Select a clean, dry location with good ventilation and
adequate working space.
Air flow under the base and out the rear must not be
obstructed. Operation with the base in direct contact with
the floor will inhibit proper cooling air flow and reduce
duty cycle.
Review PRECAUTIONS (General Information Section) to
be sure that the selected location meets all safety require-
ments.
Plasma Gas:
Compressed Air, Argon/Hydrogen, (recommended
mixture - 65% Argon, 35% Hydrogen), or Nitrogen
Pressure - 40 psi (2.8 bar)
Flow - 22 - 28 SCFH (Standard Cubic Feet/Hour)
(10.4 - 13.2 lpm) For Cutting
22 - 43 SCFH (10.4 - 20.3 lpm) For Gouging
Secondary Gas:
Compressed Air, Nitrogen, or Carbon Dioxide (CO2)
Pressure - 75 psi (5.2 bar)
Flow - 470 SCFH (221 lpm) For Cutting or Gouging
Systems that are set up for shop air operation include the
following parts for air line connections:
(2)
Air Line Regulators with Brackets
(1)
Air Line Filter Assembly (For Plasma Line)
(2)
Hex Nipples
(1)
90
°
Female Elbow
(1)
90
°
Street Elbow
(1)
Y-Hose Assembly
Refer to Figure 2-D and:
1. Thread the first hex nipple into the 90
°
female elbow.
2. Thread the other end of the hex nipple into the outlet
of the air filter assembly. Tighten both sides securely.
3. Thread the second hex nipple into the inlet of the
plasma air line regulator.
4. Thread the 90
°
street elbow into the inlet side of the
air filter assembly.
5. Connect one side of the Y-hose assembly into the
other side of the 90
°
street elbow.
6. Thread the 90
°
female elbow onto the other end of the
second hex nipple. Fasten both sides securely.
7. Install the plasma air line regulator and bracket
assembly on the rear panel (plasma side).
8. Connect the other side of the Y-hose assembly to the
secondary air line regulator.
CAUTION
Gas Supply Requirements
Air Line Filter and
Regulator Installation
Summary of Contents for SIGNATURE PAK 1250XRTM
Page 2: ......
Page 38: ...26 Figure 3 J Sequence of Operation 3 8 SEQUENCE OF OPERATION OPERATION...
Page 55: ...PARTS LIST 43 5 4 BASE COMPONENTS continued Figure 5 4 Base Components A 01467...
Page 62: ...PARTS LIST 50 5 9 TROUBLESHOOTING DIAGRAM...
Page 64: ...PARTS LIST 52 A 01583 5 11 SIGNATURE PAK 1250 XR SYSTEM SCHEMATIC SHEET 1...
Page 65: ...PARTS LIST 53 A 01583...
Page 66: ...PARTS LIST 54 SIGNATURE PAK 1250 XR SYSTEM SCHEMATIC SHEET 2 A 01584...
Page 67: ...PARTS LIST 55 A 01584...
Page 68: ......