![Thermal Dynamics CUTSKILL C-100A Operation Manual Download Page 18](http://html1.mh-extra.com/html/thermal-dynamics/cutskill-c-100a/cutskill-c-100a_operation-manual_1103306018.webp)
Installation
3-2
Manual 0-4686
4. Connect the cord to the input power terminal block
as shown for single or three phase. Input connec-
tions must be connected oposite the red and the
black wires. The white wire is used for 3 Phase.
Check for secure connections to the block. All cord
installations require a ground wire connection to the
power supply chassis; refer to the power supply
upper horizontal panel for proper ground wire con-
nection location.
Art # A-04670-S
Negro
Blanco
Rojo
NO SE
USA
Energía
de Entrada
Monofásico,
1 alambre
Art # A-04697
Black
White
Red
1 Phase
3 Wire
Input P
ow
er
Art # A-04652
Black
White
Red
3 Phase
Input P
ow
er
5. Provide a small amount of slack in the cord between
the terminal block and the through-hole protector.
Tighten the through-hole protector to the cord by
hand only. Do not overtighten or use a wrench.
For 230-Volt or 460-Volt Power Supplies Only:
6. Locate the input power bus bar block on the right
side of the power supply. Position the bars accord-
ing to the input power in use.
460V Input Power
230V Input Power
Bus Bars
Bus Bars
Ar
t # A-04650
7. Reinstall the power supply covers. Tighten the hard-
ware securely; do not overtighten.
Summary of Contents for CUTSKILL C-100A
Page 2: ......
Page 4: ......
Page 6: ......
Page 12: ...GENERAL INFORMATION 1 6 Manual 0 4686 This Page Left Blank...
Page 16: ...Introduction 2 4 Manual 0 4686 This Page Left Blank...
Page 20: ...Installation 3 4 Manual 0 4686 This Page Left Blank...
Page 24: ...Operation 4 4 Manual 0 4686 This Page Left Blank...
Page 28: ...SERVICE 5 4 Manual 0 4686 This Page Left Blank...
Page 31: ...Manual 0 4686 6 3 APPENDIX This Page Left Blank...
Page 33: ...Manual 0 4686 6 5 APPENDIX 5 6 3 4 2 7 7 A 07060 1 8...
Page 35: ...Manual 0 4686 6 7 APPENDIX This Page Left Blank...
Page 36: ......