C. Input Capacitor PCB Test
1. Using an ohmmeter check continuity between the
following points:
Input Capacitors
Meter +
Meter -
Indication
MTH 2
MTH 4
Charging
MTH 4
MTH 5
Open
MTH 6
MTH 5
Charging
Most meters will show a charging action. Initially a
low resistance will be shown and then the resistance
will start to increase. If the meter probes are reversed
the reading will decrease to zero, then start charging
in the opposite polarity.
2. If a short is found replace Capacitor PCB assem-
bly.
3. Check continuity between the following points
Input relays
Indication
MTH 2
MTH 6
Open
MTH 4
MTH 6
Open
MTH 4
MTH 5
Open
4. If a short is found, replace Capacitor PCB assem-
bly
D. IGBT Modules Test
1. Disconnect transformer wires from Main PCB
terminals PRI 1 (A) and PRI 4 (D).
2. Using an ohmmeter perform the following
checks
IGBT A
Meter (+)
Meter (-)
Indication
PRI 1 (A)
MTH 2
Forward Bias
PRI 1 (A)
MTH 4
Reverse Bias
MTH 2
PRI 1 (A) Reverse Bias
MTH 4
PRI 1 (A) Forward Bias
PRI 2 (B)
MTH 2
Forward Bias
PRI 2 (B)
MTH 4
Reverse Bias
MTH 2
PRI 2 (B) Reverse Bias
MTH 4
PRI 2 (B) Forward Bias
IGBT B
Meter (+)
Meter (-)
Indication
PRI 3 (C)
MTH 6
Forward Bias
PRI 3 (C)
MTH 5
Reverse Bias
MTH 6
PRI 3 (C) Reverse Bias
MTH 5
PRI 3 (C) Forward Bias
PRI 4 (D)
MTH 6
Forward Bias
PRI 4 (D)
MTH 5
Reverse Bias
MTH 6
PRI 4 (D) Reverse Bias
MTH 5
PRI 4 (D) Forward Bias
3. If the test reveals a failed component, replace
Main PCB and perform main contactor test – Sec-
tion 5.11-A. If no problem is found, reconnect the
transformer wires to Main PCB.
E. Output Diode Module Test
1. Disconnect transformer wires from Main PCB
terminal SEC 1.
2. Using an ohmmeter perform the tests in the
chart
Output Diode Module
Meter (+)
Meter (-)
Indication
SEC 1
WORK 1
Forward Bias
SEC 1
CHOKE 1
Reverse Bias
WORK 1
SEC 1
Reverse Bias
CHOKE 1
SEC 1
Forward Bias
SEC 2
WORK 1
Forward Bias
SEC2
CHOKE 1
Reverse Bias
WORK 1
SEC2
Reverse Bias
CHOKE 1
SEC 2
Forward Bias
3. If the test reveals a failed component, replace
Main PCB. If no problem is found, reconnect the
transformer wires to Main PCB.
F. Pilot IGBT Test
1. Disconnect wire from Main PCB terminal TIP1
2. Measure continuity on Main PCB between test
point GND1 to terminal TIP1
3. If the test reveals a failed component, replace
Main PCB. If no problem is found, reconnect wire
to Main PCB.
Signal Information
Many of the signal listed will be low voltage signals
that will be in one of two states: +12VDC (High) or
0VDC (Low) with respect to PCB common. When a
signal name is preceded by the “/” mark, it denotes
that the signal is an active low. For example:
/OVERTEMP – This signal is normally High but
when an over temperature fault exists, this line will
change state to a Low.
Summary of Contents for cutmaster A60
Page 4: ...This Page Intentionally Blank...
Page 8: ...TABLE OF CONTENTS...
Page 16: ...CUTMASTER A60 GENERAL INFORMATION 16 Manual 0 4982 This Page Intentionally Blank...
Page 24: ...CUTMASTER A60 INTRODUCTION 2T 4 Manual 0 4982 This Page Intentionally Blank...
Page 36: ...CUTMASTER A60 OPERATION 4 4 Manual 0 4982 This Page Intentionally Blank...
Page 45: ...CUTMASTER A60 Manual 0 4982 4T 9 OPERATION This Page Intentionally Blank...
Page 84: ...CUTMASTER A60 OPERATION 4T 48 Manual 0 4982 This Page Intentionally Blank...
Page 105: ...CUTMASTER A60 Manual 0 4982 5 21 SERVICE This Page Intentionally Blank...
Page 108: ...CUTMASTER A60 SERVICE 5 24 Manual 0 4982 This Page Intentionally Blank...
Page 113: ...CUTMASTER A60 Manual 0 4982 6 3 PARTS LIST Intentionally Blank...
Page 121: ...CUTMASTER A60 Manual 0 4982 6 11 PARTS LIST Intentionally Blank...
Page 124: ...CUTMASTER A60 PARTS LIST 6 14 Manual 0 4982 Intentionally Blank...
Page 139: ...CUTMASTER A60 Manual 0 4982 A 7 APPENDIX Intentionally Blank...
Page 147: ...This Page Intentionally Blank...