Manual 0-2470
27
OPERATION
4.01 OPERATING CONTROLS
Figure 4-A Operating Controls (See Table 4-A, page 28)
40
20
100
80
60
2
1
3
4
5
6
bar
psi
WORK
TORCH
ON
OFF
AC
TEMP
PIP
GAS
DC
PILOT
CSD
GAS PRESSURE
CURRENT
RUN
SET
RUN/SET Switch
ON/OFF Switch
AC Indicator
TEMP Indicator
PIP (Parts-In-Place) Indicator
CSD Control
Current Control
PILOT Indicator
DC Indicator
GAS Indicator
WORK Cable
Gas Pressure Gauge
Gas Pressure Control
TORCH Receptacle
SECTION 4: OPERATION
Summary of Contents for CE CutMaster 50
Page 12: ...GENERAL INFORMATION 8 ...
Page 79: ...Manual 0 2470 75 PARTS LIST 1 2 3 5 6 8 15 13 14 7 10 11 12 9 16 A 00775 ...
Page 85: ...Manual 0 2470 81 PARTS LIST 6 7 5 4 3 1 2 8 9 11 10 12 13 ...
Page 87: ...Manual 0 2470 83 APPENDIX This Page Left Blank ...
Page 88: ...APPENDIX 84 Manual 0 2470 APPENDIX I SYSTEM SCHEMATIC A 00804 ...
Page 89: ...Manual 0 2470 85 APPENDIX A 00804 ...
Page 90: ...APPENDIX 86 Manual 0 2470 ...