14
Ultra-Aire XT105H Installation Instructions
www.Ultra-Aire.com | 1-800-533-7533
When installing the Ultra-Aire XT105H in a structure that does not have a forced air HVAC system, a single
return for the Ultra Aire XT105H should be installed in a central location.
Install an insulated duct from outside to the 6" collar of the Ultra-Aire XT105H to provide fresh air
ventilation (optional).
The supply of the Ultra-Aire XT105H should be ducted to remote areas of the structure such as bedrooms,
living room, den, etc. Be sure to utilize multiple rooms to allow air inside the structure to properly circulate.
Proper air distribution is important to ensure even humidity control and heat distribution throughout the
structure.
A 6" diameter duct is recommended for branches to bedrooms. An 8" diameter duct is recommended for
branches to larger areas.
• DO NOT locate the return in a bathroom or kitchen.
• DO NOT locate the supply in rooms where doors may be closed.
• Control should be located remotely from the dehumidifier and placed in a central location.
Fresh Air Intake
(Optional)
Motorized
Damper
Indoor
Air Return
Ultra-Aire
Supply
403593
6
DUCTING TO HVAC SYSTEMS
No Existing Ductwork Installation
No Existing Ductwork Installation