![The Wand Company RobCo Pip-Boy Stand Construction Manual And Operating Instructions Download Page 3](http://html1.mh-extra.com/html/the-wand-company/robco-pip-boy-stand/robco-pip-boy-stand_construction-manual-and-operating-instructions_1100867003.webp)
Insert the
Long M4 Spacer Nuts
into their
respective slots at the
Bass Reflex Port
end of
the
Lower Main Housing
.
1:1 COMPONENT GUIDE
1:1 COMPONENT GUIDE
1:1 COMPONENT GUIDE
Push two of the
M5 Nuts
into the lower hexagonal
recesses in the
Bass
Reflex Port
front face.
11
Fit the
Speaker Tube
Assembly
into
Lower
Main Housing
.
M5 Nut
BOX 3
Long M4 Spacer Nut
BOX 3
Short M3 Spacer Nut
BOX 3
9
10
Insert the
Short M3
Spacer Nuts
into their
respective slots at the
Speaker
end of the
Lower Main Housing
.
12
1:1 COMPONENT GUIDE
1:1 COMPONENT GUIDE
1:1 COMPONENT GUIDE
Screw in two of the
M4
Screws
into the holes at
the
Base Reflex Port
end of the
Main Upper
Housing
. Screw in two
of the
M3 Screws
into
the holes at the Speaker
end of the
Upper Main
Housing
.
Push two of the
M5 Nuts
into the upper hexagonal
recesses in
Bass Reflex
Port
front face.
13
15
Turn the
Main Housing
Assembly
over taking
care to hold the two
case halves together.
16
Assemble
Upper Main Housing
onto the
Lower Main Housing
ensuring the all the parts align
correctly.
14
IMPORTANT
: Please note that tightening these
screws just fixes the
Hex Spacer Nuts
in place in
the
Upper Main Housing
. As a result, the two
halves of the
Main Housing
are not yet screwed
together
. You will have to turn the
Main Housing
over and fit four more screws before the two halves
of the
Main Housing
are screwed together. As you
turn over the assembly please take care to hold the
two parts of the
Main Housing
firmly together.
M5 Nut
BOX 3
Upper Main Housing
BOX 3
M3 Screw
BOX 3
M4 Screw
BOX 3