background image

04/2021  V 1.0

VIEW 19F

4mm

6mm min

Wall Pro

fi

le

Glass Panel

04/14

Using purpose built "Glass Lifters", 

position and sit the Inline Glass Panel 

on to the Underframe Gasket and push 

against the Wall Profile.

Note the orientation and position of 

the Panel, this can be determined by 

any holes or attached labels.

Remove and replace the Panel adding 

or subtracting spacers as necessary to 

level the Panel (to a maximum height 

of 5mm inside the Underframe).

Check the Panel is level using a Spirit 

Level.

Align the Inline Panel so there is a 4mm 

gap between the Panel and the front 

face of the Return Underframe.

Ensure there is adequate glass in the 

Wall Profile. (6mm is recommended)

13

14

15

16

Summary of Contents for VIEW 19F

Page 1: ...04 2021 V 1 0 VIEW 19F Illustration View 19F SB1 Stay Bar...

Page 2: ...at all times until the glass is moved to its final position Ensure that the glass is installed correctly taking care to avoid installing the glass upside down On certain panels an easy clean coating i...

Page 3: ...04 2021 V 1 0 VIEW 19F Glass Panel x1 Nylon Block x1 Supplied Parts Return Panel x1 Spacers Packers Glass to Glass Adhesive Gasket x1...

Page 4: ...F Underframe Wedge Gasket x2 Underframe x2 Underframe Gasket x2 Wall Profile x1 Wall Profile Soft Seal x1 Wall Profile Rigid Seal x1 Supplied Parts Underframe End Cap x1 Wall Profile End Cap x1 Underf...

Page 5: ...ofile is used in the following instructions Please use the below diagram to reference the list of parts A B I C H D F E G Inline Panel Return Panel Wall Profile Wall Profile Rigid Seal Wall Profile So...

Page 6: ...e distance from the tape edge to the tiling and take note of this distance F Check the dimensions are within the allowed adjustments by referencing the attached adjustment sheet Subtract 22mm from the...

Page 7: ...uble sided tape Push rmly into position and ensure that the Underframe is rmly against the wall where the channel will be xed to DO NOT use the existing tape This tape is for nal positioning of Underf...

Page 8: ...o le to create the thread to ease later steps Remove screws after drilling Fix the Wall Pro le in place Take the Wall Pro le Soft Seal and push the seal into place on the Wall Pro le to cover the scre...

Page 9: ...the Panel this can be determined by any holes or attached labels Remove and replace the Panel adding or subtracting spacers as necessary to level the Panel to a maximum height of 5mm inside the Underf...

Page 10: ...s recommended to mark on masking tape Clean the edges of the Glass Inline Panel and Return Panel where the Glass to Glass Adhesive Tape will be applied Before Installing the Glass to Glass Adhesive Ta...

Page 11: ...e Panel this can be determined by any holes or attached labels Remove and replace the Panel adding or subtracting spacers as necessary to level the Panel to a maximum height of 5mm inside the Underfra...

Page 12: ...the archway and repeat step 11 to pre drill the Wall Pro le Use a ne le to remove any burrs Be careful not to damage the channel nish Remove all tape from the underside of the Underframe Carefully pl...

Page 13: ...er mallet with the Nylon Block to protect the Glass and the Wall Pro le Repeat step 21 and 22 to reinstall and level the Glass Return Panel Pull Return Panel away from the Inline Panel Add 1mm Packers...

Page 14: ...panels are rmly xed together and remove Inline Packers Remove Packers and feed the Wedge Gasket into the archway gap and trace along the Glass on both sides Spray water on Glass Panel and use Nylon Bl...

Page 15: ...of the panel to the wall opposite Ensure this measurement is truly horizontal Subtract 6 5mm to get your nal dimension Mark the nal dimension on the Stay Bar Tube wrapped with some masking tape Caref...

Page 16: ...es with a pen Drill holes using a 5mm drill bit Assemble the Glass Clamp to the Stay Bar as shown Secure the Glass Clamp over the panel making sure the glass is fully inserted into the groove Ensure t...

Page 17: ...tape on the tiles to help Using a 5mm high quality drill bit for a clean and precise hole drill the marked areas fully insert the wall plugs and x the Connector to the wall Professional Tip If drilli...

Page 18: ...e using self tapping screws Install the Underframe End Cap Underframe Wall Channel Silicone Apply silicone sealant along the wall and oor all around the outside of the Underframe and Wall Pro les Appl...

Page 19: ...1 0 VIEW 19F 14 14 Check silicone has been applied to all the below inside areas Check silicone has been applied to all the below outside areas Let the silicone sealant cure for 24 hours Silicone Sili...

Reviews: