background image

13

14

15

16

Carefully remove the channels and

trim using a fine toothed junior 

hacksaw.

Use a fine file to remove any burrs.

Be careful not to damage the channel

finish.

Rea�ach the channels in their

previous posi�ons. This �me use the 

adhesive tape for the base channel and

silicone sealant as indicated for the wall 

channel.

Run a bead of silicone sealant down 

the back face of the wall channel to 

create a water �ght seal.

04/12

Once installed, run beads of silicone 

sealant down the inside walls of the 

wall channel as shown.

Do not run too larger beads or fill the

channel with silicone.

Using a 6mm high quality drill bit for a

clean and precise hole, drill the marked

areas and fully insert the wall plugs.

Professional Tip

If drilling ceramic tiles, place 

masking tape on the tiles before 

marking and drill through the 

tape to prevent the drill bit from 

skidding.

DO NOT use Hammer Action as 

this will break the tiles.

Silicone

View 01

07/2019  V 2.2

Summary of Contents for VIEW 01

Page 1: ...Illustration View 01 Right Hand SB1 Stay Bar VIEW 01 07 2019 V 2 2...

Page 2: ...ntil the glass is moved to its final position Ensure that the glass is installed correctly taking care to avoid installing the glass upside down On certain panels an easy clean coating is applied to o...

Page 3: ...orientation 90 Glass to wall bracket x2 Each bracket includes 2x screws and wallplugs 90 SB1 or 45 SB2 x1 If no stay bar is supplied no stay bar is needed Square Alignment Jig x1 Surface Channel x2 1...

Page 4: ...below shows a right handed screen with a 90 SB1 stay bar Please use the below diagram to reference the list of parts A B C D F E Fixed Panel Glass to Wall Bracket Stay bar If Included Channel End Cap...

Page 5: ...the three marked areas fully insert the wall plugs and x the channel 1 2 3 4 IF NOT using a shower tray posi on the base channel in the desired posi on The end of the base channel should be rmly agai...

Page 6: ...labels Using purpose made Glass Li ers squarely insert the panel into the wall channel and lower onto the spacers Take great care NOT to knock the corners as this can cause the panel to sha er Remove...

Page 7: ...s on the panel li the glass out and put to one side Note and leave the spacers in the base channel 9 10 11 12 Using a straight edge mark where both wall and base channels need to be trimmed To protect...

Page 8: ...the wall channel to create a water ght seal 04 12 Once installed run beads of silicone sealant down the inside walls of the wall channel as shown Do not run too larger beads or ll the channel with sil...

Page 9: ...crews un l the gaskets just nipping the glass Tighten all glass screws to 15 6N DO NOT t the cover plates 05 12 Check which stay bar con gura on your screen has been supplied with and refer to the rel...

Page 10: ...or hacksaw and ne le to cut and nish the edge DO NOT discard the o cut A1 A2 Stay Bar Configuration A SB1 Measure the distance from the inside face wet side of the panel to the wall opposite Ensure th...

Page 11: ...ide of the stay bar tube Ensure the stay bar is square and level Mark the end loca on on the wall Remove the stay bar A3 A4 A5 A6 Stay Bar Configuration A SB1 Assemble the glass clamp to the stay bar...

Page 12: ...to the wall Professional Tip If drilling ceramic tiles place masking tape on the tiles before marking and drill through the tape to prevent the drill bit from skidding DO NOT use Hammer Action as this...

Page 13: ...Secure the glass clamp over the panel ensuring it is ush against the wall le B1 B2 Stay Bar Configuration B SB2 Assemble the glass clamp to the stay bar 09 12 View 01 07 2019 V 2 2...

Page 14: ...drilling Use masking tape on the les to mark 10 12 B5 Using a 5mm high quality drill bit for a clean and precise hole drill the marked areas fully insert the wall plugs and x the connector to the wall...

Page 15: ...es Take care not to scratch the glass surface Fit all cover plates to the brackets and end cap to the channel 11 12 Apply silicone sealant as shown below to where the xed glass meets the base channel...

Page 16: ...licone has been applied to all the below inside areas 26 Check silicone has been applied to all the below outside areas Let enclosure cure for 48 hours 12 12 Silicone Silicone Silicone Silicone View 0...

Reviews: