background image

Page 

 of  

10 

PART LIST

PART

DESCRIPTION

BOX

QTY

1

Headboard Frame

Left Wooden Post

Right Wooden Post

Footboard Frame

Side Rail - Left & Right

Back Storage Panel

Base Panel

Center Storage Panel

Left Hydraulic Base Support

Hydraulic Pump

Back Side Bar

Front Side Bar

End Bar Left

End Bar Right

Center Bar

Middle Bar

Right Hydraulic Base Support

Wood Slat

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

1

1

1

1

2

1

4

1

1

1

2

1

1

1

1

1

2

14

1/3

1/3

1/3

2/3

3/3

2/3

1/3

2/3

2/3

2/3

2/3

3/3

3/3

3/3

3/3

3/3

3/3

3/3

Summary of Contents for CHESTER BED 3FT

Page 1: ...product is heavy it should be assembled as near as possible to the point of use 2 Please do not drag the bed frame always lift and reposition with 2 people to avoid personal injury as well as damage t...

Page 2: ...Panel Base Panel Center Storage Panel Left Hydraulic Base Support Hydraulic Pump Back Side Bar Front Side Bar End Bar Left End Bar Right Center Bar Middle Bar Right Hydraulic Base Support Wood Slat 2...

Page 3: ...se Handle M8 x 20mm JBCB Bolt M8 x 15mm JCBC Bolt M8 x 25mm JCBC Bolt A R Q P O N M L K J M8 Allen Key M8 x 30mm Wood Dowel M6 Allen Key Washer Bracket Flat Bracket M6 x 45mm JCBC Bolt M6 x 30mm JCBC...

Page 4: ...nd right wooden post 3 Secure the headboard frame using hardware parts I J and K then secure the back storage panel with hardware parts J and L Step 2 Join together the left side rail and right side r...

Page 5: ...Page 5 of 10 Step 3 Attach the headboard frame 1 and footboard 4 to the side rails using hardware part A Step 4 Insert the base panel 7 to the position 4 A 7...

Page 6: ...own in diagram 5 2 L3 L4 L4 L1 L2 L2 L3 L1 R3 R2 R1 R1 R4 R4 R3 R2 11 9 10 11 11 10 9 9 10 C C OPTION 1 LEFT OPENING OPTION 2 RIGHT OPENING Hydraulic Pump Base Support installation for OPTION 1 5 2 Hy...

Page 7: ...dware part H using hardware parts B Step 7 Join together the front back bed base 12 13 and end bar left right 14 15 using hardware parts N O and P Attach parts 16 and 17 using hardware part E M B H E...

Page 8: ...nto the pre drilled holes Please note you may need to press firmly into place After that fix base handle to the bed base with bolts E as shown Step 9 Assemble the bed base on the left right hydraulic...

Page 9: ...N FULLY ASSEMBLED Option 1 LEFT OPENING Option 2 RIGHT OPENING Step 10 Adjust the bed base make sure that the distance with the side rail approximately 15mm to above Tighten all bolts and screws HEADB...

Page 10: ...FRAME IS AT A 45 DEGREE ANGLE PLEASE PLACE THE MATTRESS ON THE BED PLEASE NOTE THAT THE WEIGHT OF THE MATTRESS IS REQUIRED TO HELP CLOSE THE BED TO LOWER THE SLEEPING PLATFORM STAND AT THE OPEN SIDE O...

Reviews: