15
EC
Hydro
Midsize
PUSHING THE MACHINE WITH THE ENGINE
STOPPED:
Open dump valve
V
on each pump by turning counter
clockwise two revolutions. Move the machine and
close dump valve
V
by turning clockwise until valve
is firmly seated.
MACHINE OPERATION