background image

CESSNA AIRCRAFT COMPANY

MODEL 404

SUPPLEMENTAL INSPECTION DOCUMENT

SUPPLEMENTAL INSPECTION NUMBER: 32-10-07

1.

Title

Main Landing Gear Trailing Link

2.

Effectivity

A.

Airplanes 404-0001 thru 404-0859.

3.

Inspection Compliance

INITIAL

REPEAT

10,000 Landings or 15 Years

2,000 Landings or 4 Years

4.

Purpose

A.

Detailed inspection of the main landing gear trailing link for cracks due to fatigue, overload, and
corrosion.

5.

Inspection Instructions

A.

Remove the trailing link. Refer to the Service Manual for removal instructions.

B.

Visually inspect the main landing gear trailing link for cracks, overload deformations and corrosion.

C.

Magnetic Particle inspect the main landing gear trailing link. Refer to Section IV, Supplemental
Inspection Number 32-10-07, for specific instructions.

D.

Reinstall trailing link in accordance with the Service Manual.

Access/Location

Detectable Crack Size

Main landing gear trailing link

0.10 Inch (2.54 mm)

6.

Disassembly and Assembly Procedures

A.

Disassembly Procedures
(1)

Remove the trailing link. Refer to Section 4-10, Main Landing Gear for main landing gear trailing
link removal instructions.

CAUTION:

Make sure that the trailing link is not damaged when the axle is
removed. Damage to the trailing link can cause more repairs or
replacements.

(2)

Remove the bolts and pins that attach axle to the trailing link.

(3)

Discard the pins.

(4)

Use an arbor press to push the axle out of the trailing link.

B.

Assembly Procedures
(1)

Coat the interface surfaces of the axle and trailing link with primer.

(2)

Make sure to turn the axle to the correct position.

(3)

Use an arbor press to push the axle into the trailing link while the primer is wet.

NOTE:

Do not apply heat to the trailing link. You can freeze the axle to make the assembly
easier.

(4)

Coat the pins with primer.

(5)

Install the pins while the primer is wet.

D2517-16-13 Temporary Revision Number 11 - Feb 15/2013

32-10-07

Page 1

Section III

© Cessna Aircraft Company

Sep 1/2006

Summary of Contents for Cessna 404

Page 1: ...es as required Please replace any copy of MEL 05 01 with the attached copy of MEL 05 01 Revision 1 which is printed in its entirety NOTE You must discard the temporary revision transmitted by MEL 05 0...

Page 2: ......

Page 3: ...llow Supplemental Inspection Document SID Section III 32 10 07 Main Landing Gear Trailing Link Section 4 10 Main Landing Gear COMPLIANCE INFORMATIONAL This service letter is for informational purposes...

Page 4: ......

Page 5: ...THIS TEMPORARY REVISION 1 For Paper Publications file this cover sheet behind the publication s title page to identify inclusion of the temporary revision in the manual Insert the new pages in the pu...

Page 6: ...Cessna Aircraft Company THIS PAGE INTENTIONALLY LEFT BLANK...

Page 7: ...Crack Size Main landing gear trailing link 0 10 Inch 2 54 mm 6 Disassembly and Assembly Procedures A Disassembly Procedures 1 Remove the trailing link Refer to Section 4 10 Main Landing Gear for main...

Page 8: ...le surface must not have dents dings or corrosion in more than three locations 2 The dents dings and corrosion can be blended and refinished if the maximum depth of the penetration is not more than 0...

Page 9: ...COMPANY MODEL 404 SUPPLEMENTAL INSPECTION DOCUMENT Main Landing Gear Trailing Link Figure 1 Sheet 1 D2517 16 13 Temporary Revision Number 11 Feb 15 2013 32 10 07 Page 3 Section III Cessna Aircraft Com...

Page 10: ...COMPANY MODEL 404 SUPPLEMENTAL INSPECTION DOCUMENT Main Landing Gear Shock Strut Figure 2 Sheet 1 D2517 16 13 Temporary Revision Number 11 Feb 15 2013 32 10 07 Page 4 Section III Cessna Aircraft Comp...

Page 11: ...RAFT COMPANY MODEL 404 SUPPLEMENTAL INSPECTION DOCUMENT Axle Main Landing Gear Figure 3 Sheet 1 D2517 16 13 Temporary Revision Number 11 Feb 15 2013 32 10 07 Page 5 Section III Cessna Aircraft Company...

Page 12: ...ANY MODEL 404 SUPPLEMENTAL INSPECTION DOCUMENT Trailing Link Assembly Main Landing Gear Figure 4 Sheet 1 D2517 16 13 Temporary Revision Number 11 Feb 15 2013 32 10 07 Page 6 Section III Cessna Aircraf...

Page 13: ...from barrel assembly and piston assembly using an arbor press j If bearings 15 and bushings 18 are to be replaced press bearings and bushings out of the trunnion by using an arbor press k If bushings...

Page 14: ...d screw switch in until actuation of switch occurs then make two complete revolutions past actuation point 2 Secure switch in this location by tightening locknut Safety wire locknut h Install air valv...

Page 15: ...CESSNA AIRCRAFT COMPANY MODEL 404 MAINTENANCE MANUAL THIS PAGE INTENTIONALLY LEFT BLANK D2517 16 13 Temporary Revision Number 11 Feb 15 2013 4 10 Page 3B Jan 82...

Page 16: ......

Page 17: ...letter is for informational purposes only LABOR HOURS Not applicable MATERIAL AVAILABILITY Not applicable WARRANTY Not applicable Please contact a Cessna Service Facility for detailed information NOTE...

Page 18: ......

Reviews: