Operation
6
SBVU056 – December 2019
Copyright © 2019, Texas Instruments Incorporated
TPS7A54EVM-031 Evaluation Module
3
Operation
Use the following steps to operate the equipment:
1. Turn on the power supplies.
2. Enable the output by jumping J3 (the EN pin) to VIN.
3. Vary the respective load and input voltage as necessary for test purposes.
4
PCB Layout
to
illustrate the PCB layout for this EVM.
Figure 1. Top Composite View
Figure 2. Top Layer Routing