Quick Start List for Platform
2-4
Quick Start
-
Evaluation Module Preparations
Figure 2–2. Module Preparation
GND
ROUT+
ROUT–
SE/BTL
S1
SHUTDOWN
GND
LOUT–
LOUT+
C10
C2
C12
VDD
GND
L IN+
GND
L LINE–
L HP
VDD
GND
R HP
R LINE–
GND
R IN+
C9
+
TPA0212 EVM Board
SLOP272
U1
+
S3
TEXAS
INSTRUMENTS
R3
R2
S2
R1
SHUTDOWN
C1
C1
1
C5
C4
C3
R4
S4
C6
C7
C8
S5
R5
S6
HP/LINE
PCBEEP
12
13
14
Table 2–4. Typical TPA0212 EVM Jumper Settings
EVM
S2
S3
S4
TPA0212
OFF
OFF
OFF
Note:
ON = Shunt installed, OFF = Open
11) To allow the module SE/BTL control input to switch the amplifier IC
between single ended (SE) and bridge-tied load (BTL) output modes, set
output mode jumper S4 to
OFF. To keep the module amplifier IC in the
single-ended output mode regardless of the control input state, set jumper
S4 to
ON.
12) To allow the module HP/LINE control input to switch the amplifier IC
between using the HP pins and the LINE pins as the signal inputs, set the
input mode jumper S5 to
OFF. To keep the amplifier IC in the HP input
mode regardless of the control input state, set jumper S5 to
ON.
Table 2–5. TPA0212 EVM Gain Settings
S2
S3
OUTPUT MODE
GAIN (V/V)
OFF
OFF
BTL
2
OFF
ON
BTL
6
ON
OFF
BTL
12
ON
ON
BTL
24
X
X
SE
1
Note:
ON = Shunt installed, OFF = Open, X = Don’t care
-
Power-Up
13) To allow the amplifier IC to switch from the LINE inputs to the HP inputs
when the output switches from BTL output mode to SE output mode and
vice versa, set jumper S6 to
ON. To allow the inputs and output modes to
switch independently, set jumper S6 to
OFF.
Platform LED2 should light indicating the presence of V
DD
, and the evaluation
modules installed on the platform should begin operation.
14) Adjust the signal source level as needed.
Summary of Contents for TPA0212
Page 4: ...iv...
Page 10: ...1 4 Introduction...