NOTICE!
Property damage due to incorrectly-
aligned platform!
If the platform is not aligned correctly, the
transport locks can be damaged when
moving in.
– Make sure that the red arrows (Fig. 57/1)
on the rotating assembly are aligned with
one another when moving into the trans-
port position.
By pressing the control levers slowly, the
speed of the platform can be adapted.
6.7
Putting the machine in transport position
Personnel:
n
Trained people
Protective equipment:
n
Protective clothing
n
Safety boots
n
Protective helmet
n
Safety harness
Definition of transport position:
n
The outriggers (Fig. 58/1) are retracted.
n
The lower boom (Fig. 58/2) is on the transport lock
n
The upper boom (Fig. 58/5) is on the transport lock
Fig. 57: Red arrows
Fig. 58: Transport position
Operation
13.02.2013
Aerial access platform Leo15GT 2012
79
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...