background image

18

97

160

Ø 40

Siphon

620

1100

80

1330

350

1100

1425

1160

750

2115

Measurements in mm.

C

- Hot water connection for 

1

/

2"

tap fittings 

F

- Cold water connection for tap fittings 

1

/

2"

O

- Connection for drainage pipe recessed in floor 

Ø40mm

CA

- Electrical connection for Hydromassage

IPX5

(box with cable press PG 13.5)

N.B. Installation must take place once floors and
walls are completed.

The information and characteristics shown do not bind Teuco Guzzini Spa who reserves the right to make any modifications it retains necessary without any prior warning or notice of replacement.

The electrical installation must comply with the safety regulations for bathroom installation, as
described in the enclosed user’s manual.

Net 

Weight

Kg.

175

300

270

291

1/2"

Ø40

mm

Water

Content

(1)

Kg.

Floor
Load

Kg/m

2

ART. 220 M

Delivery

Weight 

Kg.

4,6

Delivery

Volume

m

3

TOP 8

Vers.

No. Jets

Water

Capacity

400

l/min.

280

l/min.

Air

Capacity

6

÷

16

2

÷

5

bar

Capacity

l/

min

Min.Max.

Pressure

Supply

Drain

Conn.

HYDRAULIC CHARACTERISTICS

Hydromassage

Multifunctions

2

Vert.

Jets

Foot
Jets

2WTX28

1,35

Whirlpool

Art.

Installed Power

Kw

(1)  -  At overflow level

(2) - Before connecting the appliance, make sure that the voltage indicated on the rating plate is the same as that of the electric mains.

ELECTRICAL

CHARACTERISTICS

(2)

PRE-INSTALLATION CARD ART. 220M  

(mm 1330 x 1330)

GB

Summary of Contents for 220M

Page 1: ...acement The electrical installation must comply with the safety regulations for bathroom installation as described in the enclosed user s manual Net Weight Kg 175 300 270 291 1 2 40 mm Water Content 1...

Page 2: ...h cable press PG 21 N B Installation must take place once floors and walls are completed The room in wich the sauna is to be installed should be at least 240 cm high for service and maintenance purpos...

Page 3: ...d N B The unit must be installed after the floor and walls have been finished 1 2 ASSEMBLING THE BACK PANELS Move the shower base away from the corner in order to proceed with the subsequent assembly...

Page 4: ...the back panel A and B if necessary use a 2 5 Allen wrench Check that the seal fits properly along the entire length of the side panel support Slide the side panels A1 and B1 so that they adhere to t...

Page 5: ...ack panel and the bathtub A1 B1 4 2x45 5 C1 C1 INSTALLING THE TOP TRACK Remove the screws C1 from the ends of the top track Insert the track onto the ends of the supports and fasten it to the back pan...

Page 6: ...ted by the arrow Lift the door grasping it by the supports Tighten the screw D until the magnetic seals are aligned N B After adjusting the slide assembly lock the nuts D in place inserting the covers...

Page 7: ...of the back panels Position the suana onto the shower cabin making sure not to damage the water and electrical hoses attached to it Make sure that the steam seal G remains turned toward the inside of...

Page 8: ...e unit A2 Connection for the tap with tube 4 supplied and mounted on the cabin and the diverter A3 Connection for the cable coming from the whirlpool power unit to the control panel A4 Connection for...

Page 9: ...9 which is on the shower cabin and connected to the divertor and for hose 11 for the foot massage A2 Connection for tube 5 for shower head with nebulizer A3 Connection for tap with hose 4 which is mou...

Page 10: ...user s manual CA Electrical connection for IPX5 whirlpool box with cable clamp PG 13 5 CA1 Electrical connection for the IPX5 sauna box with cable clamp PG 21 A1 If the bathroom is equipped with an al...

Page 11: ...for shower head with nebulizer A2 Cleaning of the taps with filter A3 Connection for hose 12 for drainage for the sliding rail A4 Connection of hoses 1 2 3 for the sauna N B Hoses 1 and 2 for the deca...

Page 12: ...r the IPX5 sauna mulitfunction shower box with cable clamp PG 21 A1 If the bathroom is equipped with an alarm system it can be connected to the system using wire T see diagram A2 Connection of the ele...

Page 13: ...of the other grounds present in the room N B If one of the components indicated in the diagram is not present on the model purchased insulate the corresponding fast on ONLY FOR ARTICLES 220TOP 220PLUS...

Page 14: ...here are no water leaks in the connections made and that everything operates normally If the first time the sauna system is turned on the control panel displays the DIAGNOSIS 9 message remove the grat...

Page 15: ...o that they go back into their respective housings fasten the panel with the screw which was removed previously FIXING THE SHOWER TO THE WALL Fix the bathtub to the floor with plates T and screws and...

Reviews: