12.1 FINAL DECOMMISSIONING OF WIND TURBINE SYSTEM:
▪
Shut down the wind turbine system (section 8).
▪
Have the electrical systems and equipment removed from service by a qualified
electrician.
▪
Make sure all rotors are braked.
▪
Carefully tilt the tower.
▪
On the ground: Detach the rotor blades from the generator.
▪
Detach the generator from the tower and disconnect the electrical wiring
12.2 DISPOSAL OF THE WIND TURBINE SYSTEM AND
COMPONENTS:
▪
Where necessary, dispose of the individual components in consultation with the
responsible local authorities.
Wind turbine system
Wiring, electrical components
Dispose of as electronic scrap
Mechanical components
Segregate prior to disposal
DISPOSAL DETAIL TABLE
12.
REMOVAL FROM SERVICE AND DISPOSAL
WARNING: Risk of injury due to unqualified dismantling, e.g.
▪
Persons without suitable training
▪
Stored energy
▪
Breakage during dismantling important note on dismantling and disposal.
▪
The system must be dismantled in the proper way by a suitably qualified person.
Summary of Contents for MASTER 940
Page 2: ...TESUP MASTER 940 MADE IN EUROPE 2 TESUP A GLIMPSE OF MASTER 940 ...
Page 12: ...TESUP MASTER 940 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Page 13: ...TESUP MASTER 940 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING ...
Page 21: ...TESUP MASTER 940 MADE IN EUROPE 21 TESUP ASSEMBLY PROCEDURE ...
Page 30: ...TESUP MASTER 940 MADE IN EUROPE 30 TESUP 13 DECLARATION ...
Page 33: ...TESUP MASTER 940 MADE IN EUROPE 33 TESUP 16 NOTES ...