23
7. P
RE
-
U
S
E P
REP
AR
A
TIO
N
ATLAS X (MADE IN EUROPE)
7.5 ELECTRICAL CONNECTIONS
•
Wind Turbine has 3 phase AC connection. These connections are to be con-
nected with TESUP Charge Controller.
•
The output of the charge controller can be then connected in two ways:
•
The Output of the charge controller can be connected to the battery.
•
The Output of the charge controller can be connected to the power grid
using the inverter.
•
The cables from charge controller to the battery or the power grid will be DC
connection.
•
Cable Lengths and cross sections should be as follows:
WARNING: All work on electrical equipment must be carried out by a
qualified electrician with the power switched off!
NOTE: To ensue proper operation, you must use an original TESUP
charge controller.
Length
<11 m
<18 m
<29 m
<44 m
<68 m
<110 m
Cross
-
section
2.5 sq.
mm
4 sq.
mm
6 sq.
mm
10 sq.
mm
16 sq.
mm
25 sq.
mm
CABLE DETAILS
Summary of Contents for ATLAS X
Page 2: ...2 PRODUCT OVERVIEW ATLAS X MADE IN EUROPE ATLAS X ...
Page 11: ...11 4 1 1 POWER CURVE ATLAS X MADE IN EUROPE 4 PARAMETER DIMENSIONS POWER CURVE ...
Page 14: ...14 5 2 WIRING DIAGRAM 5 CONTROLLER ATLAS X MADE IN EUROPE WIRING DIAGRAM ...
Page 29: ...29 12 DECLARATION ATLAS X MADE IN EUROPE CERTIFICATE OF INCORPORATION ...
Page 31: ...31 14 NOTES NOTES ...
Page 32: ...32 HEADQUARTERS TESUP HEADQUATERS 22 SUTTON LANE NORTH CHISWICK LONDON W4 4LD UNITED KINGDOM ...