Chapter 2 – Installation
TestEquity 115A-EX Temperature Chamber
Page 2-1
Chapter 2 – Installation
Uncrating
Inspect the shipping container for any signs of visible damage. Notify the carrier and TestEquity
immediately if there are signs of shipping damage.
Preparation For Use
2
WARNING:
The power cord is equipped with a grounded/polarized plug. To prevent a
shock hazard, DO NOT defeat the ground or polarization feature. This device
MUST be plugged into a properly grounded and polarized outlet.
1.
Inspect the chamber for signs of shipping damage.
2.
Read this entire manual.
3.
Select a suitable location to install the chamber.
4.
Connect to a 230 VAC, 50 Hz power source with a minimum 10 Amp service.
5.
Perform the procedure “How to verify the chamber performance” in the Maintenance chapter
of this manual to make sure that no damage has occurred in shipment.
Installation Location
The chamber will produce a moderate amount of heat during normal operation. Locate the
chamber in an area with adequate ventilation to prevent excessive heat build-up. The chamber
must be on a solid and level surface that is rated to hold at least 350 pounds.
!
CAUTION:
The minimum clearance you should allow for proper ventilation around the
chamber must be at least 6" from both the left and right side, and 12" from the
rear.
!
CAUTION:
This chamber is designed for operation in a conditioned laboratory
environment. Operation above 30°C (85°F) or below 16°C (60°F) ambient
room temperature is NOT recommended.
Reversible Chamber Door
The chamber door can be mounted to open from the left or right side. The chamber cabinet has
mounting holes on both sides for the hinges and door latch. If you reverse the door, see “How to
inspect the door seal” in the Maintenance chapter of this manual to make sure the hinges and
door latch are adjusted correctly.