Operations
20 Testboy
®
Light 500
Operations
Thank you for choosing the Testboy
®
Light 500.
Operating
|
The Light 500 can be switched on or off using
the switch on the top side. The operational
time is approximately 4.5 hours. When swit-
ched on, the red LED will signal that the bat-
tery charge is low.
Loading
|
Connect the AC adapter (included in delivery)
or car charger to the charging jack and to the
mains power source (or to the car's cigarette
lighter). When switched off, the red LED indi-
cates that the external power supply is con-
nected.
|
The Light 500 will be ready for operations af-
ter about two hours. To charge the battery
completely, leave the Light 500 charging for
one to two hours.
|
Then disconnect the power supply unit from
the external voltage source (or from the ciga-
rette lighter) and from the Light 500.
Charging
jack
Switch
On / Off
Summary of Contents for Light 500
Page 1: ...Testboy Light 500 Version 1 1...
Page 83: ...Testboy Light 500 83 83 84 84 85 90 90 90 91 91 92...
Page 84: ...84 Testboy Light 500...
Page 85: ...Testboy Light 500 85 CE 30...
Page 86: ...86 Testboy Light 500 1 2 3 2 4 5 CE Testboy GmbH...
Page 87: ...Testboy Light 500 87 Testboy Testboy Testboy Testboy WEEE 2002 96 EC 13 08 2005...
Page 89: ...Testboy Light 500 89 Testboy GmbH Testboy GmbH 2006 95 EC 2004 108 EC...
Page 90: ...90 Testboy Light 500 Testboy Light 500 Light 500 4 5 2 Light 500 Light 500 1 2 Light 500...
Page 91: ...Testboy Light 500 91 2 3 Light 500 Light 500...
Page 103: ......