TI2000-009 Transformer
17
8
Unit Care and Maintenance
Check Unit Internal Resistance (Test for Shorts)
This section deals with “normal function” test proce dures, and
includes all steps necessary to ensure that the transformer is
operating within specified para meters prior to use. A digital
multimeter (an example is shown in Figure 8.2.1) capable of
measuring DC and AC voltage and resistance will be required
to perform some of the tests. These functional test procedures
should become routine.
1.
Place the negative probe on the re-
ceptacle’s left ground insert and
the positive probe on top side phase
1 insert.
2.
Move the positive probe to the right
side phase 2 positive insert.
3.
Move the positive probe to the lower
phase 3 positive post.
1.
Move the negative probe to the up-
per phase 1 probe and the positive
probe to right side phase 2 probe.
2.
Move the positive probe to the lower
phase 3 positive post.
Check Unit Approximately 120 VAC
Check Unit Approximately 208 VAC
3.
Move the negative probe to the right
side phase 2 probe and the positive
probe to lower phase 3 probe.