![Tescom TC-5972DP User Manual Download Page 56](http://html1.mh-extra.com/html/tescom/tc-5972dp/tc-5972dp_user-manual_1090868056.webp)
48
Performance Test
Do not clean this equipment with organic solvents such as benzene, toluene or acetone as they
will damage gaskets.
6.2 Performance Test
TESCOM Shield Boxes are precision RF devices built very sturdily. Their electrical performance can,
however, deteriorate with mechanical damages.
Worn out shielding gaskets, as well as metal corrosion or oxidation on the surface of lid-contacting
area, can significantly reduce the effectiveness of the Shield Box. This section describes the test and
calibration procedure for the Pneumatic Shield Box.
Performance test should be carried whenever there is a maintenance or repair work.
6.2.1 Calibration Period
●
Recommended calibration period : less than 6 months
The calibration period can vary depending on the number of operations and the equipment
management method.
6.2.2 Required Equipment
●
Spectrum Analyzer : < 6 GHz
●
Signal Generator : < 6 GHz
●
Dipole Antenna : TESCOM 900 MHz, 1.8 GHz, 2.4 GHz, 5.8 GHz
Summary of Contents for TC-5972DP
Page 1: ...TC 5972DP Pneumatic Shield Box User Manual R20191111...
Page 9: ...PART 1 1 Getting Started...
Page 13: ...PART 2 5 Hardware Description...
Page 14: ...2 Hardware Overview Front 6 2 1 Front Figure 2 1 TC 5972DP Front Components...
Page 20: ...12 Dimensions 2 5 2 Outer Dimensions...
Page 26: ...18 Fixtures Figure 3 1 Sample Images of Custom Fixtures...
Page 27: ...PART 3 19 Putting into Operation...
Page 54: ...PART 4 46 Maintenance...
Page 62: ...54 Expendables and Accessories Figure 7 1 TC 5972DP Gasket Locations...