4.2.
Converting from Arc Testing to Heater testing
If the heater testing is going to be placed onto a meter stab other than the one that was setup of arc
testing, simply remove the socket jaw that the heater testing is going to be done to by first removing
the meter from the socket, then removing the side of the socket base that will be use for the heating
test. Then locate the nut that is holding the jaw in question in place and remove it, keeping it close by.
Then replace the meter base side on the panel (Figure 12, below).
Figure 12 - Socket Base Removal